Laserfiche WebLink
<br />001G82 <br /> <br />32.8--8 <br /> <br />WATER INFORMATION MANAGEMENT SYSTEM HANDBOOK <br /> <br />Common Step 8 - Normalize and display the representative station <br />hydrograph s. <br /> <br />Display the daily mean hydr09raph data from the representative gage station <br />and divide the ordinate (CFS) axis by QB for the station. Note: The ::- <br />addition of the station flow-duration hydrograph may be useful to <br />demonstrate the relative magnitude of bankfull discharge and the dampened <br />nature of the daily mean hydrograph. <br /> <br />Common Step g - Identify on the representative gage station long term daily <br />mean hydro graph the start of the snowmelt season. . <br /> <br />From the long term daily mean hydro graph of the representative gage station <br />displayed in Common Step 8, identify the date during the snowmelt season <br />which corresponds to the occurrence, for at least 24-hours, of mean annu~l <br />discharge ("day I"). The beginning of the rising limb of the maintenance <br />flow hydrograph begins after a user defined lapse of time following day 1. <br />This is subject to user discretion. The objective is to identify the <br />average date of occurrence of peak flow and to approximately align the <br />maintenance flow hydrograph peak with this date. <br /> <br />Common Step 10 - Using the representative station norma1ized.f1ow-duration <br />curve, plot the maintenance flow hydrograph. With the completion of the () <br />calculations of the required flow components, their duration, and the <br />determination of the "Day I" index point; the scheduling of rising, <br />bankfull, and recession flow components occurs using the displayed <br />hydrograph(s) from Common Step 8. The flow rates for the individual rising <br />or step-up segments and their related durations are plotted as the <br />beginning portion of the maintenance flow hydrograph. Following the last <br />rising component step, the effective discharge is plotted with its related <br />duration. Following the effective discharge component, a series of one-day <br />recession flow segments are plotted. The recession flow segments each have <br />1 day durations at flow rates as commensurate with the flow rates of the <br />rising steps as practicable. <br /> <br />The remaining portion of the maintenance flow hydrograph consists of the <br />baseflow and low-flow rates and durations. These flows (QLl and QL2) <br />may be plotted, with user discretion, on each side of the <br />rise-bankfull-recession components (see Appendix B, exhibit 4). <br /> <br />Common Step 11 - Flow, duration, and timing for maintenance flow components <br />at the point of quantification. <br /> <br />Using the ratios displayed in Co~n Step 2 calculate required flows by <br />multiplying each ratio by the bankfull discharge calculated for each point <br />of quantification. These' flow values are required for the durations <br />calculated in Common Steps 2 and 3 on the dates described in Common Step 10. <br />