My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05613
CWCB
>
Water Supply Protection
>
Backfile
>
17000-17999
>
WSPC05613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:16:53 AM
Creation date
10/9/2006 5:24:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.500
Description
Colorado River - Colorado River Basin - Colorado River Basin General Strategy
State
CO
Date
5/9/1983
Author
Not Available
Title
Arizona/California/Nevada Compromise on Hoover Power Rates (Proposed Amendments to S. 268)
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0014S <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />-3- <br /> <br />(b) The SecretarY of ~~e I~terior is authorized to <br />construct a Colorado River bridge crossing, including suitable <br />approach spans, immediately downst=e~~ from Hoover Dam for the <br />purpose of alleviating traffic congestion and reducing safety <br />hazards. This bridce shall not be a Dart of the Boulder Canyon <br />Project and shall neither be funded nor renaid from the Colorado <br />River Dam Fund or the Lower Colorado River-Basin Development <br />Fund. <br /> <br />SEC. 202. (a) Clause (1) of subsection (c) of section ?03 <br />of the Colorado. River Basin Project Act of 1968 (?3 U.S.C. <br />1543(c); 82 Stat. 894) is revis~d to read as follows: <br /> <br />" (1) all revenues coll ected in connection with t.'1e <br />operation of facilities authorized in Title III in <br />furtherance of the purposes of this Act (except entrance, <br />admission, and other recreation fees or charges and <br />proceeds received from recreation concessionaires), ~,til <br />comoletion of reDavment reauirements of the Central ArizoIlc <br />ProJect; \I - - - <br /> <br />(b) Clause (2) of said subsection (c) is revised by <br />inserting i~~ediately preceding the existing proviso: <br /> <br />"Provided, however, That for the Boulder Canyon Project <br />commencing June I, 1987, and for the Parker-Davis <br />Project commencing June 1, 2005, and until ~~e end of the <br />repayment period for the Central Arizona Project described <br />in section 301(a) of this Act, the Secretary of Energy <br />shall provide for such surplus revenues by including the <br />equivalent of 4 1/2 mills per kilowatt-hour in the rates <br />charged tp purchasers in Arizona for application to the <br />purposes specified in subsection (f) of ~~is section and by <br />including ~~e equivalent of 2 1/2 mills per kilowatt-hour <br />in the rates charged to purchasers in California and <br />Nevada for application to the purposes of subsection (g) <br />of ~~is section as amended and supplemented: Provided, <br />further, That after the renavrnent Deriod for said central <br />Arizona Project, th~ equivalent of2 1/2 mills per <br />kilowatt-hour shall be included by the Secretary of Energy <br />in the rates charged to purchasers in Arizona, California <br />and Nevada to provide revenues for application to the <br />purposes of said subsection (g) of this section:" <br /> <br />.- ~-, ..~.._- --....- --- -~. ... <br />
The URL can be used to link to this page
Your browser does not support the video tag.