My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05613
CWCB
>
Water Supply Protection
>
Backfile
>
17000-17999
>
WSPC05613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:16:53 AM
Creation date
10/9/2006 5:24:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.500
Description
Colorado River - Colorado River Basin - Colorado River Basin General Strategy
State
CO
Date
5/9/1983
Author
Not Available
Title
Arizona/California/Nevada Compromise on Hoover Power Rates (Proposed Amendments to S. 268)
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />n01460 <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />/ <br /> <br />;=oposec sectic~ 201(a), co~side=able savings i~ ccsts c~n <br />~e achieved and ur~ecessarv o~taces ca~ be avoided bv cocrdi~a- <br />ting ~~e Uprating ?rogra~ ~iL~ L;e necessary'ongoing-re?lace~e~~ <br />of wo~-out generating ~achinery. This provision would ~ake <br />such coordination oossible and would ex~edite construction of <br />the Uprating Program. - <br /> <br />(cl Would provide for deoosit of funds advanced <br />hynon-federal purchasers for the Uprating Progra~ in the <br />Colorado River Da~ Fund and wouldfurL~er provide that such <br />funds are available for use in L~e Uprating Progra~. <br /> <br />. <br />(d) Would provide that advances by non-federal <br />purchasers used for the Uprating Program would become part of <br />L~e capital costs of the Boulder Canyon Project for rate setting <br />purposes, and L~at such advances would be returned, with interest, <br />to such ourchasers L~roucrh credits aaainst charcres to L~em. <br />. ~ ~ ~ <br /> <br />SEC. 206: Would orovide L~at reimbursement of funds <br />used for construction under-the Uprating Progra~ and the visitor <br />Facilities Progra~, including funds advanced by purchasers, is <br />a repayment requirement of the Boulder Canyon Project beginning <br />with the first dav after comoletion of L~e installation, exceot <br />L~at L~e costs of-L~eVisitor Facilities Program would beccme-a <br />repayment requirement begir~ing June 1, 1987 (L~e beginning 0= <br />the new contract period) or when substantially completed, i= <br />that is a later date. <br /> <br />SEC. 207: Would preserve existing rights in penc~ng <br />litigation in the event that this Act is adopted before L~e <br />litigation is resolved. <br /> <br />~ <br /> <br />-~- <br />
The URL can be used to link to this page
Your browser does not support the video tag.