My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05545
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC05545
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:01:41 PM
Creation date
10/9/2006 5:17:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.A.1.c
Description
Colorado River Water Projects - Animas La Plata - Description - Construction - Durango Pump Station
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/7/2002
Author
DOI-BOR
Title
Durango Pumping Plant - Stage I - Project Specifications - Volume III-B
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0)2453 <br /> <br />Durango Pumoing Plant - Stage I <br /> <br />Amendment 001 <br /> <br />C. Wet-mix process: Consists of thoroughly mixing all the ingredients except the <br />accelerator if used, feeding the mixture into the delivery equipment, delivering the <br />mixture by positive displacement or compressed air to the nozzle, and then jetting the <br />mixture from the nozzle at high velocity onto the surface to receive the shotcrete. <br />Accelerator shall be added to the mixture at the nozzle. <br /> <br />1.04 SUBMITTALS <br /> <br />A. Submit the following in accordance with Section 01330 - Submittals. <br /> <br />B. Mix proportions: Submit proportions of water, cementitious materials, sand, coarse <br />aggregate, and admixture. <br /> <br />C. Resume of nozzlemen showing qualifying experience. <br /> <br />D. Deleted <br /> <br />E. Safety plan: <br /> <br />1. Include a hazard analysis for all shotcrete operations; engineering controls, <br />protective clothing, eye protection, respiratory protection, and air sampling as <br />necessary to check the effectiveness of the control program. <br /> <br />1.05 QUALITY ASSURANCE <br /> <br />Prequalification of Nozzle men <br /> <br />I. The Contractor shall submit resumes, including experience for the last 5 years, <br />demonstrating that the proposed nozzlemen are experienced in the application of <br />shotcrete. <br /> <br />2. No shotcrete shall be applied to the work until resumes for nozzlemen have been <br />approved by the COR. <br /> <br />E. Deleted <br /> <br />A. <br /> <br />PART 2 <br /> <br />PRODUCTS <br /> <br />2.01 SHOTCRETE MATERIALS <br /> <br />A. Cementitious Materials: Section 03300 - Cast-in-Place Concrete <br /> <br />B. Admixtures <br /> <br />I. In accordance with Section 03300 - Cast-in-Place Concrete.3.4 with the following <br />exceptions: <br /> <br />a. Accelerating admixtures for shotcrete need not conform to the ASTM <br />designations specified for concrete but shall produce shotcrete meeting the <br />specified strength and bonding requirements of these specifications. <br /> <br />Shotcrete <br />03370 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.