My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05545
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC05545
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:01:41 PM
Creation date
10/9/2006 5:17:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.A.1.c
Description
Colorado River Water Projects - Animas La Plata - Description - Construction - Durango Pump Station
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/7/2002
Author
DOI-BOR
Title
Durango Pumping Plant - Stage I - Project Specifications - Volume III-B
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002125 <br /> <br />Durango Pumoing Plant - Stage I <br /> <br />I. <br /> <br />Place mass structural concrete where shown on the drawings or where the depth <br />of concrete placements exceeds 3 feet or where the wall thickness exceeds 3 feet. <br /> <br />Allow a minimum of 7 days between adjacent mass structural concrete <br />placements to allow for volumetric shrinkage due to temperature rise. <br /> <br />Embed thermocouples supplied by the Govemment at locations determined by the <br />Government in the mass structural concrete to monitor the temperature rise of <br />mass concrete for a minimum of7 days. <br /> <br />~ <br /> <br />2. <br /> <br />3. <br /> <br />3.02 BATCHING, MIXING, AND TRANSPORTING <br /> <br />A. Batching <br /> <br />I. Ensure before a concrete placement is started that sufficient cement is in storage <br />at the batch plant to complete the placement and that cement is free from lumps <br />and other deleterious matter and otherwise undamaged when used. <br /> <br />2. Notif'y the Contracting Officer 24 hours before batching concrete. <br /> <br />3. Perform batching only in the presence of the Contracting Officer unless <br />inspection is waived in each case. <br /> <br />4. Dry batching will not be allowed. <br /> <br />5. Batch admixtures separately in liquid form in dispensers capable of measuring at <br />one time the full quantity of each admixture required for each batch. <br /> <br />6. Measure either by weighing or by volumetric-admixture dispensers constructed <br />and located such that the full batch quantity of each admixture can be observed in <br />a visual gauge by the plant operator. <br /> <br />7. Discharge each admixture separately into the mixing water as the water is being <br />discharged into the mixer. <br /> <br />8. Provide, maintain, and operate the batching equipment as required to accurately <br />determine and control the prescribed amounts of the various materials entering the <br />concrete mixers. <br /> <br />9. Determine the amounts of bulk cement, sand, and each size of coarse aggregate <br />entering each batch of concrete by individual weighing. <br /> <br />10. Sand and coarse aggregate may be weighed with separate scales and hoppers or <br />cumulatively with one scale and hopper. <br /> <br />11. Weigh cement and pozzolan separately with 3ft individual scales and hoppers, <br />unless the batchp1ant is equipped with automatic sequential batching controls to <br />weigh materials cumulatively with one scale and hopper. <br /> <br />12. Measure water and admixtures by weight or by volume in accordance with this <br />section. <br /> <br />13. Where bagged cement is used, it need not be weighed ifthe concrete is <br />proportioned on the basis of integral bags of cement. <br /> <br />14. Protect all concrete materials from freezing. <br /> <br />Cast-in-Place Concrete <br />03300 - 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.