My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05427
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC05427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:01:01 PM
Creation date
10/9/2006 5:13:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/25/1996
Author
Ray Bennett
Title
Phase IIIa-White River Basin Enhancements-Memorandum-White River Project Management
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2 <br /> <br /> <br />., <br /> <br />c. <br /> <br />000719 <br /> <br />. <br /> <br />Billing: <br /> <br />RTi will provide a list of their charges to Task IIIa-2, White River Basin Model <br />Enhancement, to Ray for review before submitting the bill to the State. <br /> <br />Ray will submit progress reportdata for Task IIa-2 to RTi by for inclusion <br />into a monthly progress report which is similar to that used by RTi in year 2. <br /> <br />RTi will bill the State for charges to Task IIIa-2, White River Basin Model Enhancement <br />using the same mechanism as Year 2 work. Compilation by Rti of the monthly billing <br />and the progress report provided by Ray will be charged to Task IIIa-ll, Phase IIIa <br />Project Management and Coordination. <br /> <br />Technical Review: <br /> <br />. <br /> <br />Ray will be at RTi Tuesday and Thursday of each week to work with Bill and Steve. <br />This schedule may be adjusted based on progress, schedules, etc. <br /> <br />Bill will be responsible for performing engineering activities which are consistent with <br />his experience to date and standards of the profession. <br /> <br />Ray will be responsible for review of all technical materials produced by Bill Owen. <br /> <br />Bill will notify Ray by E-Mail whenever a technical issue arises that is critical to his <br />weekly progress. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.