My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05387
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC05387
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:00:53 PM
Creation date
10/9/2006 5:11:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/21/1996
Author
Ray Bennett
Title
Phase IIIa-White River Basin Enhancements- Memorandum-Subtask 2.06-White River Basin Assign Return Flow Characteristics
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />000753 <br /> <br />Draft <br /> <br />August 21,1996 <br /> <br />MEMORANDUM <br /> <br />To: <br /> <br />File <br />Ray R. Bennett <br />Sub task 2.06 White River Basin Assign Return Flow Characteristics <br /> <br />From: <br /> <br />Subject: <br /> <br />Introduction <br /> <br />This memo describes the results of Sub task 2.06 White River Basin Assign Return Flow <br />Characteristics. The objective of this task was as follows: <br /> <br />Specify the modeled timing and location of return flows resulting from diversions <br />by the aggregated irrigation structures, and prepare the Statemod *.rtn input file. <br /> <br />Approach and Results <br /> <br />Aggregated Irrigation Return flow Locations Based on an inspection of the <br />aggregated irrigated land locations, return flow locations were assigned to the next <br />downstream node for each of the aggregated irrigation structures modeled. <br /> <br />Aggregated Irrigation Return flow Timing Based on an inspection of the aggregated <br />irrigated land locations, return flow timing was estimated to be the same as that used for <br />most other irrigation structures in the White River Basin. This return flow pattern (Table <br />1) is presented below. <br /> <br />Month <br /> <br />1 <br /> <br />2 <br /> <br />3 <br /> <br />4 <br /> <br />5 <br /> <br />% Returned <br /> <br />Total <br /> <br />75.3 <br />17.0 <br />5.4 <br />1.8 <br />0.5 <br /> <br />100 <br /> <br />fn~\w\statem \whitet\word\mm206,doc <br /> <br />l <br />
The URL can be used to link to this page
Your browser does not support the video tag.