My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05358
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC05358
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:00:45 PM
Creation date
10/9/2006 5:10:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/30/1997
Title
RTi Admin Tool-Exhibit E-Phase IIIb Boyle Engineering Corp-Administration Tool Scope of Services
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Exhibit G <br /> <br />~ <br /> <br />Phase IlIb <br />Boyle Engineering Corporation <br />Administration Tool Compensation <br /> <br />., <br /> <br />. <br /> <br /> Time Distribution by Houls Total <br />Task Task Description Kenny (FriCk {Sundeen IFrantz IWilson {ASSOC. (ASSiSt. (Tech. IClerical Other Direct Costs Project <br />No, $110 $100 $95 $75 $75 $60 $55 $45 $35 Cost <br /> 12.0 Stochastic Data Development <br />12.1 Develop Stochastic Model 200 200 2000 33000 <br />12.2 Stochastic Model Verification 40 120 600 17000 <br />12.3 Generation of Data Sets 20 40 120 500 13300 <br />12.4 Interface Design 4 400 <br />12.5 Draft Stochastic Model Documentation 10 80 20 1500 11300 <br />12.6 Final Stochastic Model Documentation 10 20 20 1000 4800 <br />12.7 Stochastic Baseline Simulation 16 104 1500 11060 <br />12.6 Stochastic Management Evaluation 6 40 500 4380 <br /> Subtotal Task 12 7600 95240 <br /> 13.0 Contingency <br />13.1 Scope Activities 45100 <br />13,2 Perform Activjties <br /> Subtotal Task 13 0 45100 <br /> 14.0 Management <br />14.1 Progress Reports 60 24 24 40 50 12730 <br />14.2 Invoices 48 6 6 36 50 7760 <br />14.3 DMsion 5 Coordination Meetings 24 50 2330 <br />14.4 Data Extension Corodination Meetings eo 48 500 14100 <br />14.5 Division 5 Worksheet Presentation to the TAC 16 150 1670 <br />14.6 Data Extension Presentation to the T AC 20 24 8 200 5080 <br />14.7 Data extension Presentation Technical 20 24 4 leo 4900 <br /> Subtotal Task 14 1180 48570 <br /> Total 498 11036 I 1597 I 0 I 734 I 434 I 680 I 451 I 346 19960 404060 <br /> <br />C> <br />-l <br />~ <br />-l <br /> <br />May 30,1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.