My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05358
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC05358
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:00:45 PM
Creation date
10/9/2006 5:10:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/30/1997
Title
RTi Admin Tool-Exhibit E-Phase IIIb Boyle Engineering Corp-Administration Tool Scope of Services
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />EXHIBIT F <br /> <br /> PHASE IIlb <br /> BOYLE ENGINEERING CORP. <br /> ADMINISTRATION TOOL SCHEDULE <br />Task Task Description Start End <br />No. Dale Date <br /> 2.0 Review <br />2.1 Review the RTi Administration Tool Scope of Services A~I-97 Sep.30-97 <br />2.2 Review Existing eRA Spreadsheet Aug'()I-97 Sep-30-97 <br />2.3 ExIsting Division 5 Administration A~I.97 Sep-3(l-97 <br />2,4 Water User Accounting Information AUg.()I-97 Sep-30-97 <br />2.5 CROSS Planning Model Data A~I-97 Sep-3O-97 <br />2.6 Draft Review A~I-97 Sep-3(l-97 <br />2,7 Final Review Memo Aug.()I-97 Sep-30-97 <br /> 3.0 Preliminary and Draft Conceptual Design <br />3,1 Preliminary Conceptual System Design Se"..o1-97 Ocl-31-97 <br />3.2 D~ft Conceptual Desjgri 8ep-Ol-97 Ocl-31-97 <br /> 4.0 Draft Conceptual Design Review, Coordination and Final <br /> Conceptual Design <br />4,1 Draft Conceptual Design Review Ocl'()I-97 Ocl-31-97 <br />4,2 Coordination Meetings 0cl'()1-97 Nov..JO.97 <br />4.3 Other Coordination Contacts Ocl.()I-97 Nov-30-97 <br />4.4 Final Conceptual Design Ocl'()I-97 Nov..JO.97 <br /> 5.0 Preliminary and Draft Division 5 Worksheet <br />5.1 Preliminary Division 5 Worksheet Ocl'()I-97 Feb-28-98 <br />5.2 Preliminary Documentation Ocl.()I-97 Feb-28-98 <br />5.3 Draft. Documentation 0cl'()1-97 Feb-28-98 <br /> 7.0 Water User Review and Final Division 5 Worksheet <br />7.1 SWAT Workshop Feb-Ol-98 Feb-28-98 <br />7,2 Final Division 5 Worksheet Feb-Ol-98 M.y-31-98 <br />7.3 Final Documentation Apr'()I-98 Jun-JO.98 <br /> 8.0 Identify Need for Similar Process in Other Basins <br />8.1 Water Division 4,6 & 7 Presentation NoY'()I-97 Feb-28-98 <br /> 9.0 General Engineering Services <br />9.1 Scope Activities Aug-Ol-97 Jun..JO.98 <br />9.2 Perform Activities AUg.()I-97 Jun..J0.98 <br /> 10,0 Data Ex.tension Feasibility and Evaluation <br /> Methodology <br />10,1 Data Extension Feasibility Aug'()I-97 Sep-I5-97 <br />10.2 Evaluate Extension of Historic Data Sep-I5-97 Ocl-I5-97 <br />10.3 Evaluate the Development of Stochastic Data Sep-I5-97 Ocl-I5-97 <br />10.4 Review Other Methods Ocl.()I-97 Ocl-I5-97 <br />10,5 Prepare Scope of Work for Implementation Ocl-I5-97 Nov'()I-97 <br /> <br />G1~ i. <br /> <br />May 30,1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.