My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05338
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC05338
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:43:21 AM
Creation date
10/9/2006 5:09:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
3/1/1978
Author
CWCB
Title
San Luis Valley Project Closed Basin Division - 1976-1979 - Closed Basin Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DOO 711 <br /> <br />. <br /> <br />. <br /> <br />the result of the pending litigation, the state engineer has been <br />forced to curtail water diversions in the San Luis Valley. This has <br />resulted in severe economic hardship to an area which is already <br />economically depressed. The resulting bitterness towards state offi- <br />cials and among neighbors in competition over the same water supply <br />is a condition which can be eliminated by construction of the project. <br />Unless remedial action is undertaken, a series of protected legal <br />battles will take place over the next many years, none of which will <br />produce an additional drop of water. <br /> <br />The President has recommended that the sum of $500,000 be appro- <br />priated for FY 1979 to continue advance planninq on the Closed Basin <br />project. Actually, the original time schedule contemplated a construc- <br />tion start in FY 1979. The proposed deQay is a result of the Presi- <br />dent's "no new start" policy for FY 1979. Stage I of the project will <br />be ready for construction during the latter part of FY 1979. <br /> <br />In light of the critical situation in the San Luis Valley and <br />SOme construction capability during next year, it is the staff recom- <br />mendation that the board request the Governor and Colorado's congres- <br />sional delegation to seek a $100,000 construction appropriation for <br />the Closed Basin project for FY 1979, in addition to the President's <br />recommendation of $500,000 for advance planning, as Colorado's <br />priority number two. <br /> <br />FLS : tam <br /> <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.