My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05314
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC05314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:43:16 AM
Creation date
10/9/2006 5:08:09 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
Rio Grande Basin-Rio Grande Basin River Basin Water Projects-San Luis Valley Project
Basin
Rio Grande
Water Division
3
Date
4/1/1952
Title
San Luis Valley Project Monthly Reports-1952
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />San Luis Valle)' Project <br />Monthly Report <br />June 1952 <br /> <br />Rio Grande Div:lsion <br /> <br />The preliminary draft report on this division is nOl't under <br />raprodwtion am 1Iill be oompleted during August. <br /> <br />The long awaited spring flood failed to materialize on the Rio <br />Grande. '!his was on acoount of several faotors, such as adequate storage <br />space being available in reservoirs, the weather and the absorption of <br />JII1lOh water by the dry soU. Canals divert1ng from the river also had <br />one of the highest demams in history. This exoeptional demm was <br />oaused by the heavy pwnping of ground water during the 1951 crop season. <br /> <br />Conejos Div1sio~ <br /> <br />On June 14 the Project EngiDeer met with a group of farmers at <br />Manassa, Colorado to explain operations of Platoro Dam and Reservoir <br />during Calendar Year 1952. 'Ibe water users pt'esent expressed dissatis- <br />faotion with the present Board of Direotors of the Conajos Water Con- <br />servancy District. <br /> <br />On June 23. llilgineers Bierce and Holliday. accOOJP"1:1:1ad by the <br />Froject Supervisor of O&M. made the regular biennial inspection of <br />Platoro Dam. Reserwir and related faciliUeso 'lbe report on thia <br />inspection wiJ.l probably be submitted during July. Hovrever. no <br />serious Ilitua tions were disoovered. <br /> <br />On June 24 revision of the Conejos Definite Plan Report far <br />cOlll"Jents or COJlll\issionerts office was begun. <br /> <br />Closed Basin Division <br /> <br />MeaS1lr8ment or the fiuctuation of the ground water .vras continued <br />duriIlg the month by personnel of the Geological Survey. <br /> <br />General <br /> <br />Assistance was rendered the projeot by the Regional office, braooh <br />of Programs and Finance. <br /> <br />Surplus pt'operty on the project has been moving satisfactorily. <br />disposition being made to other government agencies. <br /> <br />A safety meeting was held in the Project Offioe on June 25. 1952 <br />to disouss dangel.'S to avoid in the coming SUllllOOr months in dri:v1ng <br />personal as well as gOVSr.nDIOIDt veh.i.oles. <br /> <br />~~\~lU <br />
The URL can be used to link to this page
Your browser does not support the video tag.