Laserfiche WebLink
<br />San Luie Valley ProJect <br />Monthly Report <br />October 1952 <br /> <br />Rio G1"ande Divieion <br /> <br />DuriZij! the month office work wile continued in oonnection wUoh <br />potential bydro-eleotric power Bite~ on the Rio Grande above Del Dorte, <br />Colol"ado. B;ydrologlc studies were made of the estllll>l.ted strenll\ flow <br />of the varlou. tributaries of the 1110 Orande. Jail' result. were eeoured <br />by the altitude l'Ilft-off method with the totl>.lI 1"eq,uirlng little adJUst- <br />ment. Preliminary desoriptions of potential e1te. were drafted and <br />other ground WIlrk completed leading to the preparation of a Program <br />Report covering the hydro-electr10 po1lentlah of the area. <br /> <br />InstAllation of oulverte 1n the nec.e. 1"Oad., erection of the <br />staff gage and routine work WIlS aooomplished at Platoro Dam durlug the <br />month. An illepectlon 1 1 L of the prsssure tunnel, high p1"88SUre gate, <br />and outlet pipe and valvee. Was completed during the month. Maintenanoe <br />work required will be accomplhhed during the first week 1n November. <br />Work at P1atoro will cease and faoilUies closed for the winter by <br />November 15, 1952. <br /> <br />~~s <br />~~\ <br />