Laserfiche WebLink
<br />" <br /> <br />7, A task memorandum summarizing Task 2,06 activities and results. <br />Preliminary progress, <br /> <br />Task 2.07 " Water Rights Database <br /> <br />I, Mosaic-based interfaces built to view the water rights data, Tabulation report not complete. <br /> <br />2, Complete task memo <br /> <br />3, Complete documentation <br /> <br />L Updated Users' and Developers' Manuals, 80% <br /> <br />0.e.~1I00"'V- <br />- <br /> <br />) <br />I}b,."""')' <br />CL}..., LO <br /> <br />Task 2.09 " Consumptive Use Model <br /> <br />2, Consumptive use estimates for the Western Slope of Colorado, ~ <br /> <br />3, Ability to compare two scenarios both in tabular and graphical form, .LJRI<RW"' '-': e~ <br /> <br />Task 2.10. Water Resources Planning Model <br /> <br />L Calibrated and documented water resources planning models for: <br /> <br />· Colorado River Mainstem: First draft of documentation delivered to State on 23 May, 1996, <br />Calibrated Historic Scenario delivered to the State on 23 May, 1996, Complete computed and <br />baseline data sets, Finalize documentation based on the State's review of first draft. <br />. San J uanIDolores/San Miguel Rivers: Waiting for State to complete their review of the first <br />draft of the documentation and the calibrated data sets, Finalize documentation and data sets <br />based on the State's review. <br />. White River: Submitted second draft scope of work to enhance the White River model to <br />incorporate 1993 GIS data on 21 May, 1996, Neeq.{inaLwritten~pproval from the State to start <br />work. Complete data sets and documentation. L~,-"",=- I~. 1 b L <br />. Yampa: Will incorporate State comments into final document. Will not move to on-line due to <br />anticipated change order modifications (move to 1993 GIS data). Waiting to enhance the White <br />to use 1993 GIS data before drafting scope of work to move the Yampa to 1993 GIS data, <br /> <br />2. Documented linked basins model for the six river basins. Received the program "smlink" which <br />will be used to create the basin-wide network, Have run "smlink" unsuccessfully and working <br />with the State to handle problems. (The delay patterns 1,2,3, ... are not consistent between <br />basins.) <br /> <br />Task 2.11 " Analysis System and System Integration <br /> <br />I, A toolbox for analyzing time series output, both for individual time series and on a basin-wide <br />scale, <br />Working on displaying map, sorting time series, displaying regression results in output, <br />probability plot. All other subtasks should be reviewed by the State. <br /> <br />, toc,\j\,- \\..:'15 <br /> <br />168~ <br /> <br />o3201i"comp,doc 5nj/iJ6 <br /> <br />2 <br /> <br />I "'''',\\,-~ ~'''-'-1\.' <br /> <br />..... b;~k ~' <br />