My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05076
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC05076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:42:10 AM
Creation date
10/9/2006 4:59:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8408
Description
Platte River Basin-River Basin General Correspondence
State
CO
Basin
South Platte
Water Division
1
Date
4/18/1975
Author
BOR
Title
Front Range Unit Feasibility Study-General Information-Front Range Unit Longs Peak Division Pick Sloan Missouri Basin Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />I <br />~ <br />.> <br /> <br />DRAFT <br />Aprill8, 1975 <br /> <br />To: Public Involvement Task Force <br /> <br />From: Project Leader, Bureau of Reclamation <br /> <br />Subject: General Information, Front Range Unit, Longs Peak Division, <br />Pick-Sloan Missouri Basin Program <br /> <br />What is the authority for this study? <br />The Secretary of the Interior was authorized by Public Law 9l-8l <br />(9lst Congress, October 8, 1969) to conduct the Front Range Unit <br />investigation. <br /> <br />Who is involved in the investigation? <br /> <br />Boulder, Larimer, and Weld Counties, municipalities within these counties, <br /> <br />the State of Colorado, two Regional Councils of Governments, and various <br /> <br />Federal agencies have been contacted about the investigation. <br /> <br />What is the purpose of the study? <br /> <br />The purpose of the study as recently modified to document the results of <br /> <br />the technical analysis performed by the Bureau of Reclamation present <br /> <br />some potential storage plans of development and to publish a status <br /> <br />report. Additional detailed studies will be deferred until a later clate. <br /> <br />When will the status report be completed? <br /> <br />The work ancl analysis for the report is scheduled for completion in <br /> <br />late 1975. <br /> <br />0797 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.