Laserfiche WebLink
<br />~. <br /> <br />~98~ <br />Mu. <br /> <br />. <br /> <br />. <br /> <br />. . <br /> <br />~ ~ <br /> <br />Other Major Topics Discussed During the Mitigation Meeting <br />of tillrch 10, 1981, Closed Basin Division, <br />San Luis Valley Project, Colorado <br /> <br />1. The near-term construction and operational schedule for the project <br />division. <br /> <br />2. The capability of Water and Power to use non-Federal funds to accelerate <br />construction of the project division. <br /> <br />3. The concept of proportional sharing of waters delivered by the project divi- <br />sion (Public Law 92-514 priorities; pending position by the Department of <br />the Interior; pending request to the Congress for clarification). <br /> <br />4. The potential adverse effects of the project division on Blanca WHA and the <br />means available to mitigate for these effects. <br /> <br />5. The existence of well permits add status of applications for water right <br />adjudications for Blanca WHA. <br /> <br />6. Predicted quality of pumped ground water for the project division (e.g., <br />long-term pump test well TW3-1). <br /> <br />7. The potential for obtaining ground water for the Head and San Luis Lakes <br />area before implementation of project division plans, and the status of or <br />options to a Public Law 89-72 repayment contract for that area. <br /> <br />8. Replacelnent by the Colorado Division of Wildlife of incremental losses of <br />project division water caused by deliveries to Head Lake; includes asso- <br />ciated incremental losses at wetlands between Head and San Luis Lakes. <br /> <br />9. Methods of acquiring lands and appurtenant water rights in the <br />Russell Lakes area, and the capability of the Colorado Division of Wildlife <br />to manage that area. <br />