My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04984
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:41:46 AM
Creation date
10/9/2006 4:57:05 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
3/30/1981
Author
Robert H Weimer
Title
San Luis Valley Project Closed Basin Division - 1980-1981 - Results of Mitigation Meeting of March 10, 1981 and proposed Mitigation Plan for the Closed Basin Division
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~. <br /> <br />~98~ <br />Mu. <br /> <br />. <br /> <br />. <br /> <br />. . <br /> <br />~ ~ <br /> <br />Other Major Topics Discussed During the Mitigation Meeting <br />of tillrch 10, 1981, Closed Basin Division, <br />San Luis Valley Project, Colorado <br /> <br />1. The near-term construction and operational schedule for the project <br />division. <br /> <br />2. The capability of Water and Power to use non-Federal funds to accelerate <br />construction of the project division. <br /> <br />3. The concept of proportional sharing of waters delivered by the project divi- <br />sion (Public Law 92-514 priorities; pending position by the Department of <br />the Interior; pending request to the Congress for clarification). <br /> <br />4. The potential adverse effects of the project division on Blanca WHA and the <br />means available to mitigate for these effects. <br /> <br />5. The existence of well permits add status of applications for water right <br />adjudications for Blanca WHA. <br /> <br />6. Predicted quality of pumped ground water for the project division (e.g., <br />long-term pump test well TW3-1). <br /> <br />7. The potential for obtaining ground water for the Head and San Luis Lakes <br />area before implementation of project division plans, and the status of or <br />options to a Public Law 89-72 repayment contract for that area. <br /> <br />8. Replacelnent by the Colorado Division of Wildlife of incremental losses of <br />project division water caused by deliveries to Head Lake; includes asso- <br />ciated incremental losses at wetlands between Head and San Luis Lakes. <br /> <br />9. Methods of acquiring lands and appurtenant water rights in the <br />Russell Lakes area, and the capability of the Colorado Division of Wildlife <br />to manage that area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.