Laserfiche WebLink
<br />... .000977 <br />. . <br /> <br />., <br /> <br />. <br /> <br />. <br /> <br /> <br />United States Department of the Interior <br />WATER ANn POWER RESOURCES SERVICE <br /> <br />IN REPLY <br />REFER TO: 720 <br /> <br />SOUTHWEST REGION <br />COMMERCE DUlLDlNG, 714 S. TYLER, SUITE 201 <br />AMARILLO, TEXAS 79101 <br /> <br />MAR :J 0 ISbl <br /> <br />r~'r7!l""'~"""'~1 <br /> <br />, <br />APR 01 1981 I <br /> <br />. ..__._...._.. I <br />COLO. v.. <br />CONSERVATION BOAR.... <br /> <br />Memorandum <br /> <br />To: Regional Director, Region 6, Fish and Wildlife Service, <br />Denver, CO <br /> <br />From: Regional Director <br /> <br />Subject: Results of }litigation ~leeting of March 10, 1981, and Proposed <br />Mitigation Plan for the Closed Basin Division, San Luis Valley <br />Project, Colorado <br /> <br />We appreciate the progress at the suhject meeting in revlslng the mitigation <br />plan. With the exception of the Blanca Wildlife Habitat Area (WHA), our offices <br />were in accord for predicting adverse effects caused by the project division and <br />for recommending related mitigation measures. These predicted effects and <br />mitigation recommendations were presented by the Fish and Wildlife Service <br />representatives during the morning of the subject meeting. TI1e basic elements <br />of that morning's presentation are enclosed. <br /> <br />In an attempt to resolve predictions for adverse effects and related mitigation <br />measures specifically for Blanca WHA, FWS and Bureau of Land Yillnagement (BLM) <br />representatives met during the afternoon of }illrch 10. A mitigation plan encom- <br />passing Blanca WHA was proposed and briefly discussed in the late afternoon of <br />March 10 by representatives of the FlvS, BLM, and Water and Power Resources <br />Service (Water and Power). In our opinion, logical methods were used in pre- <br />dicting the adverse effects and recommending the related mitigation measures for <br />the late afternoon proposal, but some of the calculations and resulting values <br />need refinement. <br /> <br />During the week of Ylinch 16 we have continued to work with the FWS and Bll1 to <br />arrive at a recommended total revised mitigation plan. Enclosed is a copy of <br />that plan. We are naturally aware that mitigation recommendations from the <br />field level will receive higher-level review before the Secretary of the Interior <br />requests concurrence from the Congress on the revised mitigation plan. <br /> <br />Other topics <br />copy of this <br />the meeting. <br /> <br />discussed during the morning of March 10 are also enclosed. By <br />memorandum, we are furnishing meeting results to those notified of <br />We thank all of the attendees for their time and assistance. <br /> <br />~ IJ, tJ~ <br /> <br />Enclosures <br />