Laserfiche WebLink
<br />Closed Basin Division Financial Summary, March 1980 <br /> <br />p.- <br />.~ <br />:::::> <br />aD <br /><?J/9 <br />(;Ie <br /> <br /> Appropriation Ceiling, Nov. 1979 DPR Nov. 1979 DPR Extrapolated <br /> -Indexed from 1972 II Cost Estimates Benefi;-Cost21 Cost19~90ct. <br /> (Jan. 1979 prices) Uan. 1979 prices) Rat1.os <br /> . <br />Stage 1-2 $ 19,264,000 0.74-1 <br />Stages 1-2, and 3 $ 33,381,000 0.99-1 <br />Stages 1-2, 3, 4,. and 5 $ 37,621,000 $ 52,937,000 1.02-1 $57,139,0001/ <br /> <br />'" <br /> <br />Notes: <br /> <br />11 <br /> <br />The-ceiling -in Public Law 92-514, the authorizing legis lation, was $18,246,000 (April 1972 <br />prices).- <br /> <br />l! The- May 1970 reevaluation showed-a benefit-cost ratio of 2.14-1 for the entire project division <br />(Stages 1-2 through 5)~ <br /> <br />. <br /> <br />1/ <br /> <br />This cost is about $lI.2_million above the appropriation ceiling extrapolated to October 1979 <br />prices ($39~96S, ooor: <br />