My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04842
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04842
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:41:13 AM
Creation date
10/9/2006 4:52:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Indian Water Rights Ute Tribes
State
CO
Basin
Statewide
Date
9/1/1986
Author
Boyle Engineering
Title
Agricultural Engineering Study Southern Ute and Ute Mountain Ute Indian Reservations San Juan East Watershed Task D and E Report Step A
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1345 <br /> <br />Off-farm irrigation transmission facilities were conceptually <br /> <br /> <br />designed for those parcels with preliminary payment capacities <br /> <br /> <br />greater than the off-farm water pumping costs. The pumping cost was <br /> <br /> <br />re-evaluated, added to the facilities cost, and compared to the <br /> <br /> <br />preliminary payment capacity. <br /> <br />To complete the PIA analys is, the cropp ing pa t tern and payment <br /> <br /> <br />capacities will be reviewed by the economist taking into account the <br /> <br /> <br />practicality of the cropping pattern for the particular parcel and <br /> <br /> <br />any agronomic costs that might be particular to the parcel. Several <br /> <br /> <br />iterations of this process between the economist and the engineer may <br /> <br /> <br />be necessary in order to develop the most economical parcel and <br /> <br /> <br />facilities layout. Those parcels that still exhibit positive <br /> <br /> <br />res idual payment capac i ty af ter these fur ther analyses are then <br /> <br /> <br />determined to be practicably irrigable. <br /> <br />0.2 SELECTION OF PARCELS FOR OFF-FARM DESIGN <br /> <br />Parcels to be considered for PIA analysis were identified in the Task <br /> <br /> <br />B Report along with on-farm irrigation costs. The Task B report <br /> <br /> <br />identified irrigation costs for handmove sprinkler, sideroll <br /> <br /> <br />sprinkler, gravity (furrow or basin), center pivot, and center pivot <br /> <br /> <br />with sprinkler in the corners. Computer tabulation compared on- <br /> <br /> <br />farm irrigation costs to the crop payment capacity for an <br /> <br /> <br />alfalfa/barley crop rotation. <br /> <br />The first step in making this task analysis was determination of the <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.