My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04842
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04842
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:41:13 AM
Creation date
10/9/2006 4:52:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Indian Water Rights Ute Tribes
State
CO
Basin
Statewide
Date
9/1/1986
Author
Boyle Engineering
Title
Agricultural Engineering Study Southern Ute and Ute Mountain Ute Indian Reservations San Juan East Watershed Task D and E Report Step A
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />l 135,0 <br /> <br />be pumped without a diversion. <br /> <br />The berm may require regrading several times during the irrigation <br /> <br /> <br />season. However, the overall cost of such diversions is minimal. <br /> <br /> <br />The decision on the type and size of diversion will vary with each <br /> <br /> <br />parcel and would require extensive review in the field. Therefore, <br /> <br /> <br />in order to simplify the analysis it is assumed that no special <br /> <br /> <br />diversion structure will be required for parcels of 30 acres or less. <br /> <br />In cases where several parcels can be served from one diversion and <br /> <br /> <br />the combined acreage is over 30 acres, the cost of the diversion is <br /> <br /> <br />divided between the parcels in proportion to parcel acreage. This <br /> <br /> <br />approach is believed to be conservative (in favor of generating PIA) <br /> <br /> <br />and realistic for this type of analysis. <br /> <br />D.3.5 Other Costs <br /> <br /> <br />Annual maintenance of major facilities including pipelines, pump <br /> <br /> <br />stations, and river diversions is estimated at 0.5 percent of the <br /> <br /> <br />initial construction cost. <br /> <br />The cost of electrical energy is assumed to be $0.068605/KWhr for the <br /> <br /> <br />southern Ute area and $0.065039/KWhr for the Mountain Ute area. <br /> <br /> <br />These are commercial user rates being charged during the first half <br /> <br /> <br />of 1985. A detailed discussion of the power costs was previously <br /> <br /> <br />provided. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.