Laserfiche WebLink
<br />~~ <br />\;/ <br />~I'> <br />~ <br /> <br />"'" ", <br /> <br />~0'2'2.3n <br /> <br />, <br /> <br />diversions and the modeled transmountain diversions resulting from this task. These graphs <br />will be of monthly data for the modeled study period of 1975 through 1991. This subtask is <br />not expected to require recalibration of the model given the expected magnitude of the <br />changes made. <br />2p--~nrl;ty relevant-seGti9llS-of till' HTML documentation on cando-ttrrefleenliiSSii6task. (Let's <br />--talk-a15outhowmuch). ~d t.or-.t 1.;"-,,; 4" !/c.,,,, I IIJM. <br /> <br />Deliverables (referencing subtask identifiers): <br />2cl A memo (5-6 pages) that describes the current (phase ll) operation of the <br />transmountain diversions for the historic and calculated scenarios for the Colorado <br />River Basin and recommendations for improvement of the operation of these <br />structures. <br />2c2&2c3 Modified input data sets for the transmountain diversions for the historic and <br />calculated scenarios to reflect the strategy agreed on by CRDSS management. Re- <br />simulation of both scenarios. <br />2c4&2c5 Documentation of the subtask through a 5-6 page memo and assoicated changes made <br />to the on-line documentation. (Add time and dollars for draft review process by <br />state). <br /> <br />Cost Estimate. <br />Task 2c 1 16 hours @ $82/hr = <br />Task 2c2 4 hours @ $ 82/hr = <br />Task 2c3 16 hours @ $ 82/hr= <br />Task 2c4 8 hours @ $ 82/hr= <br />Task 2c5 8 hours @ $ 82/hr= <br />Total Approximate Subtask Cost <br />-;;: <br /> <br />$ 1300 <br />$ 330 <br />$ 1300 <br />$ 650 <br />$ 650 <br />$4,200 <br /> <br />Schedule' <br />Given Mr. Bethel's 20 hour per week time commitment to the CRDSS Project, it is <br />anticipated that the above work would be performed over the course of 3 weeks from March <br />17 through April 4. <br /> <br />r " <br />Subtask LR-2d Revisions to Transmountain Diversions in Baseline Scenarios <br /> <br />Objective. <br /> <br />It has been observed that demands for transmountain diversions in the baseline <br />scenario may not have been consistently generated or adequately reflect current <br />concepts of use of these systems. Changes are necessary to improve the modeling <br />base. <br /> <br />Scope of Work <br />2d. I Review the modeled demands, and modeled output for the transmountain diversions in the <br />baseline Colorado River scenario in light of historic records of diversions (assumed to be <br />readily available records from the CRDSS database). Generate recommendations for <br />suggested changes to the modeled transmountain demands to achieve consistency or the most <br />recent information available. Summarize the information gained on the demands and the <br />modeling change recommendations in a 5-6 page memo. <br />2d.2 In a 4 hour meeting with CRDSS management and/or CWCB staff, review and finalize <br />changes to be made to the modeled operation of each of the transmountain diversions in the <br />