Laserfiche WebLink
<br />'. <br /> <br />'n tJ~'~~ 8 <br />''0. . <br /> <br /> <br />I .(t:'~ ~...J. <br /> <br />strearnflow and the modeled (calculated scenario) streamflow suIting from this task. These <br />graphs will be of monthly data for the modeled study pe od of 1975 through 1991. This <br />subtask will not in"y'olv:~re"c!lliJ1ration of the model since it is the calculated rather than the <br />historic scenarto tOat is being aCljiiSted. <br />:2a:.9-==MOOiiy-relevant-seGtioos-efthe IITML documentatioa-on-. - - . -, <br /> <br />6 . - - $.hal. 1lI~"Ia1. 1 ? ~ It;.. "( .."o"s; .l.N_<!.1>"..' <br />All. t f<"".... j · <br />i ( eferencing s . e 1fi <br />1&-2 A memo 5-6 page at describes the current (phase IT) operation of the 16 <br />reservoirs, the commendations and a recommended modeling strategy. The <br />intent of this memo is to serve as a dicussion foundation for finalization ofmodeIing <br />strategies with the CRDSS management. <br />Modified "calculated" scenario input data for the 16 reservoirs in the Colorado River <br />Basin model reflecting changes agreed on with the CRDSS management team. <br />Documentation of the subtask through a 5-6 page memo and associated changes made <br />to the on-line documentation. (Add time and dollars for draft review process by <br />state). <br /> <br /> <br />2a3&2a4 <br /> <br />2a5&2a6 <br /> <br />Cost Estimate' <br />Task 2al 8 hours @ $82/hr = <br />Task 2a2 8 hours @ $ 82/hr = <br />Task 2a3 4 hours @ $ 82!hr= <br />Task 2a4 8 hours @ $ 82!hr= <br />Task 2a5 8 hours @ $ 82!hr= <br />Task 2a6 8 hours@ $ 82!hr= <br />Total approximate subtask cost <br /> <br />$ 650 <br />$ 650 <br />$ 330 <br />$ 650 <br />$ 650 <br />$ 650 <br />$3,600 <br /> <br />/ <br /> <br />Schedule: <br />Given Mr. Bethel's 20 hour per week time commitment to the CRDSS Project, it is <br />anticipated that the above work would be performed over the course of 3 weeks from <br />February 17 through March 7. <br /> <br />Suhtask LR-2b Reservoir Operations Modifications to Baseline Scenario <br /> <br />Objective. <br /> <br />Modify the "baseline" scenario input files for the Phase IT Colorado River water <br />resources model to reflect similar changes that were made to the calculated scenario <br />in subtask 2a above. Document the modifications made to the Baseline scenario. <br /> <br />Note: No changes are anticipated to be made to the "historic" run in which the reservoirs were <br />operated with historic volume targets. <br /> <br />Scope of Work <br />2b.l Modify the "baseline" model's input data (in the base model data directories on cando)to <br />reflect the agreed on operating rules (from subtask 2a). It is anticipated that modifications <br />to the statemod progrant would not be necessary and that changes would only be made to the <br />"baseline" scenario input data for the model. Rerun the baseline scenario. <br />2b.2 Prepare a subtask 2b documentation memo that summarizes the methodology, assumptions <br />and results. The results of these changes will be summarized at a downstream streamgage <br />