My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04781
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04781
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:40:58 AM
Creation date
10/9/2006 4:48:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
Rio Grande Basin-Rio Grande Basin River Basin Water Projects-San Luis Valley Project
Basin
Rio Grande
Water Division
3
Date
1/1/1953
Title
San Luis Valley Project Monthly Reports-1953
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Conejos Oivi8ion <br /> <br />During the month a letter was sent to the President of the Conejo8 <br />Water Conservancy District notifying of the possibility of a oompletion <br />notiae being issued serly ~1 1953 in regard to Pletoro Dam and Rel.rvoir. <br />LetteTs \'leTe prepllJ'6d following a conferenoe in the Regional O1'fioe on <br />January 15 requesting permission to issue such a notice. Tho attorney <br />for the Conejos Distriot J'6co_nded to the Distriot's BoPI'd of OiJ'60tOTS <br />thet they take no aotion until d'ter the next meeting of tho Rio Grande <br />Compa"t. Commlsel.otl. The Boerd of Direotors will undoubtedly follow <br />this reoommendption. <br /> <br />The preliminary oompletion report and completed DC-l were finished <br />fOT Platoro Dam and ReservoiT dUTing the month. <br /> <br />Forec6ste of rivel' run-off for the ooming season were tho subjeot <br />of lIlUoh study snd llorl'espondenoe during the month. Hydrologists <br />oonf'erred with tho Chief, Branoh of' Hydrology, in Denver, Colol'e40 on <br />Januery 28, 19611 on this prOblem and IlJIlde euggestions whereby fore- <br />outs oan pTobllbly be improved ill e.oaul'flCy. <br /> <br />Closed Basin Divieion <br /> <br />Offioe work on the preparation of II progrmn report on this <br />Division wes oontinued during the month. A finding of non-fellibility <br />is praotioally certain under present limitation. imposed by the RiO <br />Gl'M4e Compaot 011 any salvage weter for whioh ol'edit ill to be desired. <br />Interpretetions at thoso limitations msy leed at lIoms future time to <br />feasibility. <br /> <br />During the month the fluotuation of the ground 1I'Qtar teble WIle <br />measured .t numerous wells in the IIrea. <br /> <br />Gene"l <br /> <br />By tho end ot Januuy the Annual Project History for Celendar <br />Yeer 1952 weB essentially oomplete. <br /> <br />During the month the Projeot S011 Soientist spok~ to the vocational <br />agrioulture group sponsored by the Vetel'Blle MJllinistrstion et Center, <br />Colorado. Details of results t'rom the first yeer of operating the <br />experlmental plots were oxpleined to the c18ss. <br /> <br />On January 29, 1953 8 meeting is to be held in the Regional Offioe <br />to disouas finanoial problellJS oonoerning the projeot' s progrl\lll tor <br />Fisoal Yeer 1954. <br /> <br />~~\9:,~r <br />
The URL can be used to link to this page
Your browser does not support the video tag.