My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04766
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:40:54 AM
Creation date
10/9/2006 4:48:24 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.70
Description
Colorado River Water Projects - Colorado River Storage Project - CRSP - Publications
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
2/28/1973
Author
Unknown
Title
Project Reports-Summaries-Descriptions - Fruitland Mesa Project - CRSP
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0- 0 j ~ '71 <br /> <br />Fruitland Mesa Project (Continued) <br /> <br />Project Costs - Basin Fund ($1,000)!/ <br /> <br />Project costs (October 1971 prices) <br />Soap Park Dam and Reservoir. <br />Crystal Creek Diversion Dam. <br />Curecanti Diversion Dam. <br />Black Vesa Conduit . . <br />Fruitland Canal. . . . <br />Gould Canal structures <br />Laterals . . . . . . . <br />Drains . . . . . . . . <br />Crystal Creek channel protection <br />Transitional development costs and other <br />physical property. . . . . . . . <br />Operation and maintenance headquarters . <br />Total . . . . . . . . . . . . . . . <br />Annual operation, maintenance, and replace- <br />ment costs 1 63-6 rices)....... . 53 <br />1 Exclusive of construction cost and annual operation, maintenance, <br />and replacement cost to be financed by the Forest Service for recreation <br />facilities at Soap Park Reservoir. These were originally estimated re- <br />spectively at $987,250 and $17,200. No new estimate is available. <br />gj Includes $546,000 costs for D&MC program on Gould Siphon not <br />shown on regular project PF-2. <br /> <br />Water Supply <br /> <br />13,600 <br />540 <br />125 <br />19,800 <br />.< 1200 <br />0830 <br />1,600 <br />480 <br />380 <br /> <br />350 <br />43J~, <br /> <br />Source: Water will be provided from Soap, Curecanti; and Crystal Creeks-- <br />all tributaries of the Gunnison River and project irrigation. <br /> <br />Project Supply (acre-feet) <br /> <br />Diversions <br />Irrigation water' ~57,900 <br />!I Includes 15 acre-feet annually <br />for public use at Black Canyon of the <br />Gunnison National Monument. <br /> <br />De-pletion of Colorado River (acre-feet) . . . . . ., . . . . . . 28,000 <br /> <br />Quality of Water <br /> <br />Chemical analysis indicates the project water supply is of excellent <br />quali ty . <br /> <br />Hydrological Data <br /> <br />Soap Park <br />Reservoir <br /> <br />Drainage area <br />Square miles <br />Mean elevation <br />Runoff (acre-feet annually)!! <br />Maximum <br />Minimum <br />Average <br />y For 1941-65 period of study. <br />I{f <br /> <br />47.0 <br />10,130 <br /> <br />80,900 <br />17,600 <br />43,900 <br /> <br />f <br />r <br /> <br />~ <br /> <br />, <br />I <br />t <br />I <br />I <br /> <br />i <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.