<br />002u34 <br /> <br />Durango Pumping Plant Stage I <br /> <br />Amendment 001 <br /> <br />SPECIAL PROVISIONS <br /> <br />1. STRUCTURE. <br /> <br />This clause describes the format of a typical construction contract to construct features of the <br />Animas-La Plata Project. Each construction contract for project features will have at least <br />three volumes: <br /> <br />Volume I <br />Volume 2 <br />Volume 3 <br /> <br />Business Agreement <br />Master Agreement of Terms and Conditions for Construction <br />Specifications and Drawings <br /> <br />Ifnecessary because of the number of pages, additional Volumes may be issued or they may <br />be divided into appropriate parts, for example: <br /> <br />Volume 3 <br />Volume 4 <br /> <br />Specifications Divisions I through end <br />Geological Data <br /> <br />2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, FAR <br />52.211-10 (APR 1984) <br /> <br />I <br />~ <br /> <br />The Contractor shall be required to: (a) commence work under this contract within 10 <br />calendar days after the date the Contractor receives the notice to proceed (NTP), (b) <br />prosecute the work diligently, and (c) complete the parts of the work ready for use as stated <br />below: <br /> <br />Work Completion <br />All items of work as shown in the <br />specifications and drawings, . . . . . . . . . . . . . . . . . . . .. 360 Calendar Days after Receipt of <br />NTP <br /> <br />The time stated for completion shall include final cleanup of the premises, <br /> <br />The intent of the specified completion date is to provide for the entire Durango Pumping <br />Plant building foundation to be available for the initial structural concrete placements <br />beginning in March, 2004. This is based on award of the Durango Pumping Plant, Stage 2 <br />contract in July, 2003. <br /> <br />In-water work, including. but not limited to, installation of cofferdams, excavation through <br />riverbank for intake structure, excavation for bypass pipe, installation and backfill of bypass <br />pipe, construction of intake structure, installation of bulkhead gates and trashracks, riverbank <br />restoration, installation of temporary water barrier, etc., shall not start until after the end of <br />Labor Day Weekend of any given year. <br /> <br />- II - <br />