Laserfiche WebLink
<br />002031 <br /> <br />SCHEDULE <br /> <br />- <br />Item Section Work or Material Quantity and Unit Amount <br /> unit Price <br />9 15-foot 149 each $ 583.09 $ 86,880.41 <br />10 20- foot 50 each $ 715.06 $ 35,753.00 <br />II 02267 River Channel Pipe 350 lin ft $ 33.45 $ 11,707.50 <br /> Trench Reinforcement <br />12 02317 Pipe Trench Backfill 515 ydJ $ 20.52 $ 10,567.80 <br />13 02318 Excavation for Structures 38,100 ydJ $ 3.95 $ 150,495,00 <br /> (common) <br />14 02318 Excavation for Structures 118,500 ydJ $ 19.23 $ 2,278,755.00 <br /> (rock) <br />15 02323 Soil-Cement Slurry 391 yd3 $ 115.64 $ 45,215.24 <br />16 02512 ' Furnishing and Installing 339 lin ft $ 227.41 $ 77,091.99 <br /> 36SDR 32.5 HDPE Pipe <br />17 02512 Furnishing 36SDR 32.5 35 lin ft $ 136.11 $ 4,763.85 <br /> HDPE Pipe <br />18 02523 Grouting and Abandoning 17 wells $ 342.44 $ 5,821.48 <br /> Existing Monitoring <br /> Wells <br />19 02523 Constructing Protective For the lump surn of $ 16,072.12 <br /> Barriers around Existing <br /> Monitoring Wells <br />20 03156 9,inch PVC Waterstop 93 lin ft $ 14.65 $ 1,362.45 <br />21 03210 Steel Reinforcement 60,000 Ibs $ 1.02 $ 61,200,00 <br />22 03300 Structural Concrete 296 yd3 $1,018.48 $ 301,470.08 <br />23 03300 Mass Structural Concrete 510yd3 $ 234.99 $ 119,844.90 <br />24 03300 Lean Concrete 315 yd3 $ 231.13 $ 72,805.95 <br />25 03300 Cementitious Materials 227 tons $ 186.05 $ 42,233.35 <br />26 03370 Shotcrete 35 yd3 $ 421.98 $ 14,769.30 <br />27 Deleted <br />28 03370 Weep Holes in Shotcrete 220 weep $ 23.02 $ 5,064.40 <br /> holes <br />29 05500 Miscellaneous Metalwork For the lump sum of $ 2,178.61 <br />30 11284 Intake Bulkhead Gates For the lump sum of $ 129,164.38 <br /> <br />/ <br />\ <br /> <br />-.()-, , <br />