My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04744
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:40:47 AM
Creation date
10/9/2006 4:47:51 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Ute Tribes
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/8/1986
Author
Boyle Engineering
Title
Agricultural Engineering Study - McElmo Watershed - Task D-E Report - Step A
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1687 <br /> <br />0.4.3 Cropping Pattern <br /> <br /> <br />FOr the preliminary analysis of PIA, a cropping pattern with the <br /> <br /> <br />highest net agricultural returns was used. Table 0.2 identifies <br /> <br /> <br />this cropping pattern as well as the net agricultural return, Lands <br /> <br /> <br />in the McElmo Watershed were located within climatic Zones 0 and E. <br /> <br />D.4.4 Preliminary PIA Analysis <br /> <br /> <br />A preliminary PIA analysis was performed comparing a parcel's <br /> <br /> <br />payment capacity with a preliminary estimate of the cost to pump <br /> <br /> <br />water from the river to the parcel. This preliminary water cost was <br /> <br /> <br />based on the static pumping lift (the difference in elevation from <br /> <br /> <br />the water surface in the river to the elevation of the parcel) for <br /> <br /> <br />gravity irrigated fields or plus a field delivery pressure of 60 psi <br /> <br /> <br />for sprinkler irrigation. Detailed tabulations of the analysis are <br /> <br /> <br />shown in Appendix 0.1. Table 0.3 identifies only those parcels with <br /> <br /> <br />a positive residual payment capacity requiring further <br /> <br /> <br />consideration. A total of 13 parcels covering 495 acres showed a <br /> <br /> <br />positive residual payment capacity. <br /> <br />An off-farm irrigation transmission system was designed for those <br /> <br /> <br />parcels showing a positive residual payment capacity. Those <br /> <br /> <br />calculations are shown in Appendix 0.2 and summarized in Table 0.4. <br /> <br /> <br />parcels with a positive payment capacity after comparing the <br /> <br /> <br />residual payment capacity to the cost of water are initially <br /> <br /> <br />identified as practicably irrigable. <br /> <br />Instead of designing individual lines of supply to each of these <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.