My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04681
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04681
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:40:30 AM
Creation date
10/9/2006 4:44:52 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
11/30/1944
Author
Robert C Brown
Title
San Luis Valley Project Closed Basin Division - 1944-1946 - San Luis Valley Project, Colorado, Monthly Report for November, 1944
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />;: <br /> <br />I" <br />,,~ <br /> <br />) I; <br /> <br />001732 <br />"j <br /> <br />organization of the district and furtherance of the project were disoussed. In <br />conolusion it was decided that a further conference would be held on the project <br />in which Judge Stone and the Regional Counsel should partioipate and in which <br />proposed desired amendatory legislation to the Colorado Water ConserV!l.ncyAot <br />of 1939 might be rough drafted 'for oonsideration by the ooming session of the <br />. Colorado Assembly. The date for, this conferen,?e has not' yet been fixed. <br /> <br />Conejos Divisiont ,Several members of the Conejos Water gonservanoy Dis- <br />trict Board of Directors attended the Assooiation meeting. These members., <br />'Attorney Jean Breitenstein. Regional Direotor. Regional Counsel and Engineer <br />Brown met with Commissioner Bashore. follojdl).g the Rio Grande Conferenoe. for <br />discussion of Conejos Division of the Project. The Board-members expressed a <br />desire that the Bureau conclude its investigations as soon possible in order <br />to place the Conejos Division in line for oonstruotion at ,the earliestoppor- <br />tunity. ' <br /> <br />Organization and ~ersonnel. <br /> <br />The number of employees during November toteled 38 of which 7 were <br />on survey parties. ., on diamond drilling. 3 in the prodect offioe. and 19 on <br />tes~..pits. ' <br /> <br />'.. , <br /> <br />Weather. <br /> <br />Weather during the month was unsettled with a number of stormy and <br />cold days. There is approximately 6 inches of snow on the ground at the Elk <br />Creek Dam site. <br /> <br />Plans for Coming Month. <br /> <br />Exploration at the Elk Creek Dam site will oontinue by diamond drill. <br />Sampling o'f oonstruotion materials by test-pits, will be 'oompleted and topograp. , <br />hio, survey of the reservoir basin will oontinue as' long as weath~r permits.' <br /> <br /> <br />Engineer <br /> <br />Copies tOt Mr. Clifford Stone. Direotor. Colorado Water Conservation Board..c- <br />Mr. M C. Hinderlider. Colorado State Engineer. <br />Regional Direotor. Region 5. <br /> <br />7 <br /> <br />'I <br />'I <br /> <br />"I <br /> <br />,b <br />!:-' <br />,t""' <br /> <br />",~~; <br />,~. ,'., <br />- ::"1 <br />, , <br />, '.~J <br />I;...:.:l <br /> <br />i <br /> <br />", ~l <br />13 <br />~r;J <br />:'tn~ <br />-~ <br />.' '~ <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.