My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04606
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04606
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 11:18:24 AM
Creation date
10/9/2006 4:42:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8045
Description
Section D General Studies-Federal Projects-General
Date
1/1/1981
Author
Norman E Stauffer Jr
Title
Moon Lake Power Plant Project-Reports 1979-80-Utah-Colorado White River Simulation Users Manual
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />IPSA <br /> <br />I POWER <br /> <br />INDIAN <br /> <br />i <br />I <br />i' <br />I <br /> <br />IPQX <br /> <br />, <br />i <br /> <br />VAR(I) <br /> <br />I' <br />i <br />, <br /> <br />I <br /> <br />I <br />i, <br />:1 <br /> <br />logic variable: Set equal to 1 for printing out reservoir <br />end of month surface area. Set equal to 0 to skip printing <br />of reservoir end of month surface area. <br /> <br /> <br />logic variable: Set equal to 1 for simulation of <br />hydropower generation minimizing hydropwer spills using <br />predicted February through June inflol'/ and reservoir <br />storage. Set equal to 2 for simulation of hydropower <br />generation using run of the river flows. Set equal to 3 to <br />;imulate hydropower generation using reservoir monthy <br />';arget levels. Set equal to 0 to skip hydropOl'ier <br />'1eneration computations. If set equal to 0 no hydropower <br />Jata will be read into the simulation. <br /> <br />I <br /> <br />\ <br /> <br />l <br /> <br />:_ogic variable: Set equal to 0 to require indian <br />irrigation flows to remain in the river to the indian <br />jiversion point without storage water for the indian land, <br />ie., the indian land would have 1st priority on the river <br />flow ahead of reservoir storage in Utah or Colorado. Set <br />equal to 1 to give indian land 1st priority on the White <br />River Reservoir. Set equal to 2 to give indian land last <br />priority on the White River Reservoir. <br /> <br />Index numbers used to determine which simulated streamflows <br />will be printed out (limited to 32 simulated flOl'is). <br /> <br />Column headings used on printout as follows: <br />YEAR OCT NOV DEC JAN FED MAR APR MAY JUN JUl AUG SEP ANN <br />If calendar year data is used then replace OCT to SEP with <br />JAN to DEe. <br /> <br />., <br />0';)3'- <br />
The URL can be used to link to this page
Your browser does not support the video tag.