Laserfiche WebLink
<br /> <br />J <br />-- <br />l.. <br />1 <br />'11 <br />;- <br /> <br />I <br /> <br />'II <br /> <br />i <br /> <br />III <br />III <br />ill <br />II <br />.- <br />II <br />II <br /> <br />'1I"'""""iJ" <br /> <br />HDMN <br /> <br />Minimum head at which power can be generated by the power <br />plant in feet. <br />Tail water elevation of the power plant in feet. <br /> <br />ELT <br /> <br />El <br /> <br />Over-all power plant efficiency divided by 100. <br /> <br />CP <br /> <br />Coefficient to convert power generation output to <br />megawatt-hours. <br /> <br />QTG(K) <br /> <br />Utah White River Reservoir monthly target levels in <br />acre-feet. These values are used for regulating the <br />reservoir on a monthly basis for such uses as flood control <br />or hydro-power operations. This data must be read in if <br />IPOWER 0, but is only used if IPOWER is equal to 1 or 3. <br /> <br />QMRL(K) <br /> <br />Utah White River Reservoir maximum reservoir release in <br />acre-feet per month. Used with QTG(K) for operating the <br />i'eservoir with monthly target values. <br /> <br />Bl <br /> <br />~l, B5, B6, B7, B8, are B9 and monthly factors used to <br />lIaximize the hydropower generation on the Utah White River <br />[am. Optimizing is achieved by a trial and error procedure <br />requiring a number of simulation runs. This data is <br />required input data (may be zeros), but is used only if <br />IPOWER is equal to 1. Bl should be set equal to -1 for <br />opt imi zat ion. <br /> <br />B5 February optimization factor. <br />B6 M~rch optimization factor. <br />B7 Alril optimization factor. <br /> 0327 <br />B8 May optimization factor. <br />B9 June optimization factor. <br />