My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04560
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:40:02 AM
Creation date
10/9/2006 4:40:53 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.70
Description
Colorado River Water Projects - Colorado River Storage Project - CRSP - Publications
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/1/1971
Author
Unknown
Title
Project Reports-Summaries-Descriptions - West Divide Project - CRSP
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0005.38 <br /> <br />sm.!:.w:rt SHEE'l'S <br /> <br />West Divide project <br /> <br />:,OCATION: 'West-central Colorado in Upper Colorado River Basin <br /> <br />:'JJ,U <br /> <br />~:.C West Divide project is planned primarily to prov"ide 'Water for irriga- <br />~io~ and for municipal and industrial use in connection with develop~ent <br />o~ local oil shale reserves. It also would provide benefits to recrea- <br />tion, fish and wildlife, and flood control. <br /> <br />Project water would be obtained from a series of Colorado River tributar- <br />ies south of the river. Crystal River flows would be regulated at Pla- <br />-:ita Reservoir. Some reservoir releases would be made directly to the <br />river for downstream uses. Most of the releases, however, would be di- <br />verted into the Hunt~man Canal and conveyed westward to West Divide Creek <br />for subsequent distribution in the western portion of the project area by <br />the East and West Divide Canals. Thp. diverted flQ'ris would be supplemented <br />by water stored in Haystack Reservoir on small tributaries of West Divide_ <br />Creek. Natural flown at Haystack Reservoir W'ould be augmented by flows <br />of nearby streams diverted b;y' feeder canal. Yank Creek Reservoir would <br />be constructed on North Thompson Creek to meet project needs in the east- <br />ern portion of the project area. Releases from this reservoir would be <br />distributed by the Fourmile Canal. Irrigation laterals would be con- <br />structed from the main project canals, and drains would be prmrided as <br />needed. Municipal and" industrial water OIould be made available for sale <br />in the Colorado River and in the Hest Divide and Fourmile Canals. Facil- <br />ities for reregulation, distribution, and treatment of the municipal and <br />industrial supply ...'Culd be the responsibiLit~- of' the ;.reter Users. Recre- <br />ational developments \.'Ould be provided by the Forest Service at all proj- <br />ect, reservoirs since the reservoirs would be within National forest bOWld- <br /> <br />aries. <br /> <br />WATER SUPPLY (average acre-feet annually) <br /> <br />. <br /> <br />Increased supply fr~~ project <br />Irrigation \.-ater . . . . <br />J.hmicipal and industrial water <br />Total . . . . . . . <br /> <br />115,600 <br />77, 500 <br />193,100 <br /> <br />76,400 <br /> <br />Depletion of Colorado River <br /> <br />" <br /> <br />IRRIGm'ION SERVICE Afu":A (acres) <br /> <br />, <br /> <br />lS.1.:},.-., <br />, - <br />. ^- <br /> <br />":;"I. ~.l ;~: -.'-.C":: 11' .~ <br /> <br />'_'c-'.;al <br /> <br />-- . - -- <br />;;,.-).;...:0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.