My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04555
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04555
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:40:00 AM
Creation date
10/9/2006 4:40:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/30/1997
Title
BEC IIIb-Div 5 Worksheets-Data Extensions-Contingency Authorizations-Exhibit E Phase IIIb Boyle Engineering Corp Administration Tool Scope of Services
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table 1 <br />Preliminary Division 5 Worksheet Identification (I) <br /> <br />Sheet Source Description <br />1 Division 5 Summary Worksheet <br />2 Division 5 Colorado River Administration <br /> 3 Division 5 Green Mountain Beneficiaries <br />4 USBR Green Mountain Reservoir Operations <br />5 USBR Fryingpan-Arkansas Project <br />6 USBR / NCWCD Colorado Big Thompson & Windy Gap Project <br /> 7 Denver Water Dillon Reservoir and Roberts Tunnel Operations <br /> 8 Denver Water Moffat Collection System Operations <br /> 9 Denver Water Williams Fork Reservoir and Collection System <br /> 10 CRWCD Wolford Mountain Reservoir <br /> 11 Colorado Springs Blue River Collection System <br /> 12 Colorado Springs & Homestake Project <br /> Aurora <br /> 13 Clinton Reservoir Co. Clinton Reservoir <br /> 14 15 - Mile Reach - Orchard Mesa Irrig., Pump & Hydropower Operations <br /> Summary <br /> - Grand Valley Water Users Association <br /> - Grand Valley Irrigation Co. <br /> 15 Division 5 Transmountain Diversions <br /> - Alva B. Adams Tunnel <br /> - Moffat Water Tunnel <br /> - Berthound Pass Ditch <br /> - Roberts Tunnel <br /> - Hoosier Pass Tunnel <br /> - Homestake Tunnel <br /> - Boustead Tunnel <br /> - Columbine Ewing <br /> - Wurtz Ditch <br /> - Busk-Ivanhoe Tunnel <br /> - Grand River Ditch <br /> - Eureka Ditch (abandoned) <br /> - Berthod Pass Ditch <br /> - Boreas Pass Ditch <br /> - Twin Lakes Tunnel <br /> - Vidler Tunnel <br /> - Eisenhower (Straight Creek) Tunnel <br /> <br />c: \w\crdss\scope\boylllb\crdss3 .doc <br /> <br />0348 <br /> <br />5/30/97 - Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.