My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04555
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04555
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:40:00 AM
Creation date
10/9/2006 4:40:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/30/1997
Title
BEC IIIb-Div 5 Worksheets-Data Extensions-Contingency Authorizations-Exhibit E Phase IIIb Boyle Engineering Corp Administration Tool Scope of Services
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1. SWAT Team workshop and meeting minutes. <br />2. Operational Division 5 Worksheet. <br />3. Final Documentation <br /> <br />Task 8 - Identify Need for Similar Process in Other Basins <br /> <br />Responsibility: Boyle <br /> <br />Objective: Determine the need for special Division Worksheets in other western slope Division's <br />(4, 6, & 7) within the Colorado River basin. <br /> <br />Approach: <br /> <br />8.I.Water Division 4,6, & 7 Presentation Conduct one (I) half day interview with personnel <br />from Water Division's 4, 6, and 7 at a location mutually agreed upon. The program developed <br />for the Colorado River and presented to the SWAT Team in previous Tasks will be presented. <br />A memorandum will be prepared which documents comments received and the potential need <br />for similar applications in other west slope divisions. <br /> <br />Deliverables: <br /> <br />I. Workshop and meeting minutes. <br /> <br />Task 9 - General Engineering Services <br /> <br />Responsibility: Boyle <br /> <br />Objective: To assist the State in the implementation of the Administration Tool "Beta Testing" <br />program or other mutually agreed upon activities. <br /> <br />Approach: <br /> <br />9.I.Scope Activities As directed by the State, prepare a task order which reflects the approach, <br />deliverables, budget and schedule mutually agreed upon in writing by the State and Consultant. <br />The format of the task order is expected to be similar to this scope of work. <br /> <br />9.2.Perform Activities Perform the activities mutually agreed upon in writing by the State and <br />Consultant. <br /> <br />Deliverables: <br /> <br />1. Task Order(s) which describe the approach, deliverables, budget and schedule that are <br />mutually agreed upon in writing by the State and the Consultant. <br /> <br />2. Deliverables mutually agreed upon in writing by the State and Consultant. <br /> <br />0345 <br /> <br />C:\w\crdss\scope\boy IIIb\crdss3 .doc <br /> <br />5/30/97 - Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.