My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04554
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:40:00 AM
Creation date
10/9/2006 4:40:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.765
Description
Colorado River-Colorado River Basin-White River General Publications-Corresp-Reports
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/1/1943
Title
A War-Time Water Facilities Plan for the Lower White River Basin in Rio Blanco Moffat and Garfield Counties Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />19 <br /> <br />C. Interest, Taxes, etc. <br /> <br /> <br />Interest on $815.00 @ 5% per annum <br /> <br />$; 24.59- <br /> <br />Taxes and insurance on $815.00 @ 5% <br />per annum <br /> <br />Total <br /> <br />24.59, <br />$ 48.78 <br /> <br />Cost per acre-foot <br /> <br />~ 0.15 <br /> <br />D. Depreciation and Maintenance <br /> <br />Pump at 8% per annum <br /> <br />:r" <br /> <br />8.72 <br /> <br />Engine and connections @ 12% per annum <br /> <br />46.20 <br /> <br />Pipe connections @ 5% per annum <br /> <br />2.64 <br /> <br />Repair and replacements per annum <br /> <br />20.00 <br /> <br />- Total <br /> <br />~I 77.56 <br /> <br />') <br />~,- <br /> <br />Cost per acre-foot <br /> <br />~? <br /> <br />0.2.1 <br /> <br />E. Operation. <br /> <br />Fuel - 9~gallons distillate per acre-foot <br /> <br />$ <br /> <br />0.72 <br /> <br />Lubricant per acre-foot <br /> <br />0.10 <br /> <br />Total <br /> <br />$; <br /> <br />0.82 <br /> <br />Estimated Actual Field Cost per Acre-Foot <br /> <br />Items C, D, and E <br /> <br />l' <br />-:i <br /> <br />1.16 <br /> <br />Cost per acre irrigated <br /> <br />5.48 <br /> <br />Note: Cost of equipment furnished by Fairbanks 110rse and <br />International Harvester Company. <br /> <br /> <br />0813 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.