My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04542
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC04542
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:39:57 AM
Creation date
10/9/2006 4:40:08 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/1/1995
Title
RTi 2nd Development Year Invoices-CRDSS Progress Report-Year 2-May 1995
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001053 <br /> <br />CRDSS Progress Report <br />Year 2 <br /> <br />Progress for Task No.: 2.04 Month: May 1995 Preparer: Doug Greer <br />Phvsical Characteristics Database <br /> Work Product Subtask <br />Subtask (Including Form and Date % <br />No. Detailed Activitv DescriDtion Provided to State) Complete <br />I Review Database Design Completed design and table structure, 100 <br /> Comnleted review of desil!n, <br />2 Facilitate User Involvement 15 <br /> Conducted Database Technical Subcommittee <br /> meetinl! on Mav 23, 1995, <br />3 Populate Data Populated both temp and final tables for 40 <br /> L Ponulated structures data for Division 5. Div5, <br />4 Mosaic Inteifaces 0 <br /> No work comnleted on this subtask this month <br />5 CU Coordination 100 <br /> Worked with IDS to rearranl!e soil coeff data, <br />6 Summary Task Memo 0 <br /> No work comoleted on this subtask this month, <br /> <br />Subtask <br />No. <br />2 <br /> <br />Pro ress Concerns <br />Ross Bethel believes that the user involvement process will be more worthwhile if the August 22 <br />Database Technical Subcommittee meeting is postponed until September when more of the database <br />interfaces will be available. Dou Greer will notif subcommittee members of a new meetin date, <br />More effort has been required to resolve data issues than was allowed in the budget. Money that was <br />ori inall bud eted for data 0 ulation in this task is nearl ex ended, <br /> <br /> <br />3 <br /> <br />Authorized <br />Bud et <br />$40,560 <br /> <br />Task Bud et Status (Based on Invoice) <br />Previously Current Month <br />Invoiced Invoice Amount <br />$8,504 $2,935 <br /> <br />Total Cost to Date <br />$11,439 <br /> <br />Cost! Authorization <br />28% <br /> <br />A320 05.95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.