My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04507
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC04507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:39:47 AM
Creation date
10/9/2006 4:38:50 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/12/1996
Title
RTi HydroBase-CRDSS Scope of Services 2
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />., <br />" <br /> <br />j <br /> <br />Task - 84 Derived Water Rights Tables <br />The State will provide the Derived Water Rights tables, (Transactions and Net Amounts, <br />and Aug_ wr), produced by the HB - WR Project. <br /> <br />Task - 85 DWR Data <br />The State will provide the Dbase files necessary to populate DWR data into HB - <br />CROSS, These files include the streams, structures (headgates, reservoirs, small dams, <br />jurisdictional dams), diversions (daily, monthly, annual time series), and diversion <br />comments, In addition, the State will provide the GIS data for the irrigated acreage table <br />population and streamflow data collected by DWR, <br /> <br />Task - 86 Error Correction <br /> <br />The State is responsible for correcting data errors associated with DWR data that are <br />identified by RTi in error logs, In addition, the State will coordinate with division <br />offices to correct any minor changes made by RTi that were approval by the State and <br />documented in afixed log. <br /> <br />Task - 87 Document Review <br />The State will provide review of memoranda and documents within 2 weeks after <br />submittal by RTi. <br /> <br />3.0 RTi Responsibilities <br /> <br />RTi will perform the following tasks to construct HB - CRDSS, <br /> <br />Task Rl - Setup New Disk Drive. <br /> <br />Approach <br />RTi will purchase a 2 gigabyte disk drive or larger for use by this project. The disk drive <br />will be installed on the database server, configured and made ready for the HB - CROSS <br />database, The disk drive will be the property of the State for use by R Ti for execution of <br />this project, <br /> <br />Deliverable <br />RTiwill: <br />I, Provide a memorandum describing the results of this task, It is expected to be <br />approximately 1-2 pages in length, <br />2, Provide the disk drive purchased under this contract to the State, upon completion of <br />this project, <br /> <br />09'33 <br /> <br />Scope of Work, HB. CRDSS, 12/11196 <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.