My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04478
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC04478
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:39:40 AM
Creation date
10/9/2006 4:38:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111
Description
Colorado River Basin-Water Projects-Central Utah Participating Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/8/1988
Author
Peter G Ungerman
Title
Central Utah Project-Ceiling Increase Legislation-Colorado River Storage Project-Completion of Participating Projects-Distribution of Revenue-Funding Proposal-Revision 1
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER STORAGE PROJECT <br />WATER PROJECT COMPLETION FUND <br />REVISION 1 <br /> <br /> YEAR lIfAH UTAH UTAH lIfAH <br /> WITHDRAWAL WITHDRAWAL CUMULATIVE FUND <br /> % AMOUNT WITHDRAWAL BALANCE <br /> (If Needed) <br /> 1111 <br /> 1112 <br /> 1113 <br /> 1 II. <br /> 1115 75% $36.662,625 $36,662,625 ($2..152..73) <br /> 1116 75% $36.044,250 S72,706,875 ($51,864,238) <br /> 1117 75% $36.044,250 $108.751.125 (Si7.575.803) <br /> lU. 75% $35,833.875 $144,585,000 ($103.137.300) <br /> 1111 75% $35.833.875 $180.418.875 ($128.698.798) <br /> 2000 75% $35.833.875 $21..252.750 ($154.2.0.295) <br /> 2001 75% $35,833.875 $252.09...25 ($179..21.793) <br /> 2002 75% $35..33..75 $287.920.500 ($205.393.290) <br /> 2003 75% $35.833,875 $323.754.375 ($230.944.7..) <br /> 200. 75% $35..33..75 $359.588.250 ($25..50..2.5) <br /> 2005 75% $35.540,625 $395.128.875 ($281.858.598) <br /> 200. 75% $35.425,875 $430.554.750 ($307.129,055) <br /> 2007 75% $35.355.750 $465.910.500 ($332.349.490) <br /> 200. 75% $35.285,625 $501.198.125 ($357.519.903) <br /> 2008 75% $35.215.500 $536.411.825 ($3.2..40.293) <br /> 2010 75% $35.139.000 $571.550.625 ($407.708.113) <br /> 2011 75% $35.068.875 $606.619.500 ($432.721.910) <br /> 2012 75% $35.094.375 $641.713.875 ($457.755.898) <br /> 2013 75% $13.829.581 $655.543.436 ($461.519.589) <br /> 2014 0% $0 $655.543.436 ($451.446.409) <br /> 2015 0% $0 $655.543.438 ($441.387.746) <br /> 2018 0% $0 $855.543.438 ($431.281.774) <br /> 2017 0% $0 $655.543.436 ($421.217.731) <br /> 2018 0% $0 $655.543.436 ($411.175.619) <br /> 201 I 0% $0 $855.543.436 ($401.153.609) <br /> 2020 0% $0 $655.543.436 ($391.153.529) <br /> 2021 0% $0 $655.543.436 ($381.175.379) <br /> 2022 0% $0 $655.543.436 ($371.219.159) <br /> 2023 0% $0 $855.543.436 ($361.284.869) <br /> 202. 0% $0 $655,543.438 ($351.372.509) <br /> 2025 0% $0 $655.543.436 ($341.482.079) <br /> 202. 0% $0 $655.543.436 ($331..'3.579) <br /> 2027 0% $0 $655.543.438 ($321.761.526) <br /> 202. 0% $0 $655.543.438 ($311.924.094) <br /> 2028 0% $0 $655.543.436 ($302.103.109) <br /> 2030 0% $0 $655,543.436 ($292.29..744) <br /> 2031 0% $0 $655.543.438 ($282.508.826) <br /> 2032 0% $0 $655.543,436 ($272.724.219) <br /> 2033 0% $0 $655.543.438 ($262.948.921 ) <br /> 2034 0% $0 $655.543.436 ($253.180.934) <br />'-"'; 2035 0% $0 $655.543.436 ($243.420.256) <br />203. 0% $0 $655.543.436 ($233.....889) <br />2239 2037 0% $0 $655.543.436 ($223.933.624) <br />2038 0% $0 $655.543.436 ($214.220.481 ) <br />20311 0% $0 $655.543.436 ($204.525.574) <br /> 20.0 0% $0 $855.543.436 ($194.850.789) <br /> $655.543.436 <br /> $13.110.869 <br /> Bonneville Unit Funding Slart 1995 <br /> Bonnevnle Unit Funding End 2013 <br /> Project NomInal COSI(1988) $350.000.000 <br /> Proj8cl Cost Indexed $655.543.436 <br /> <br />Study.Wate rfun d-8.5/4/0 <br /> <br />PAGE -2- <br /> <br />CuweD uel 8/8/88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.