My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04475
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC04475
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:39:40 AM
Creation date
10/9/2006 4:38:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272
Description
Colorado River Basin-Colorado River Basin Water Quality-Salinity-Organizations and Entities
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/20/1981
Title
Colorado River Salinity-Water Rights Issues-Corres Reports etc 1981-82-Salinity Control Water Rights
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />c . <br /> <br />, <br />J ' <br /> <br />. <br /> <br />. <br /> <br />~ ''''f <br /> <br />Phoenix, AZ <br />03-20-81 <br /> <br />Salinity Control Water Rights <br /> <br />, <br /> <br />Issues of Concern: <br /> <br />'-, <br /> <br />Procedures for acqui ri ng di vers i on ri qhts. Current procedures for di vert- ".- <br />ing saline water under State Water Law are unclear, particularly since <br />(1) some states do not recognize salinity control as a high priority bene- <br />ficial use, and (2) only implied authority exists to purchase needed <br />diversion rights from existing water rights holders for salinity control <br />purposes. <br /> <br />- Allocation of wasted water among states. Since a majority of the salinity <br />control opportunities are in only two of the states, potential exists for <br />placing an inordinate burden on those states if substantial volumes of <br />. water must be wasted to meet program objectives. <br /> <br />- Transfer of saline water among states. Studies of saline water use for <br />industrial/energy related purposes suggest that some of the more attractive <br />options involve intrabasin/interstate transfer of saline water from source <br />to point of use. Although procedures exist among upper basin states to <br />allocate Colorado River water use to the state where the use takes place, <br />no such procedures exist for intrabasin exchanges among lower basin states, <br />nor from upper to lower basin. <br /> <br />Replacement of wasted water. The current law of the river recognizes the <br />joint Federal/state partnership for the salinity control program. However, <br />although legislative precedent exists for replacing water wasted for <br />Title I and for meeting the delivery obligations to Mexico, the states <br />currently are expected to fully absorb water use requirements of Title II. <br /> <br />Development of Water Rights Procedures: <br /> <br />It is suggested that the Forum Work Group be assigned the task of developing an <br />overall water rights procedu~e for Title II programs. These procedures could <br />include: <br /> <br />- Acquire diversion rights under State Water Law using eminent domain where <br />necessa ry. <br /> <br />- Allocate wasted water among states based upon their mainstem consumptive <br />use entitlements as defined in the applicable compacts and decrees. <br /> <br />- Provide for exchanges of water rights among states and for related adjust- <br />ments of creditable volume against the water delivery requirements of <br />applicable compacts and decrees. <br /> <br />- Provide for a Federal. obligation to replace an equitable portion of water <br />required to be wasted to accomplish Title II objectives. <br /> <br />0046 <br />
The URL can be used to link to this page
Your browser does not support the video tag.