Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />&[2.291 <br /> <br /> Table 3.--Brush Creek Canals salt loading reduction <br /> Canal Estimated Length Cost . <br /> seepage salt to be Total effective- <br /> reduction reduction lined annual ness <br />CANAL acre-ft/yr! tons! miles cost~ $/ton <br /> (rounded) <br />Sunshine 685 820 3.8 $141,790 $175 <br />Burns Bench 660 790 4.0 164,520 210 <br />Burton 261 310 1.2 36,090 120 <br />Murray 114 140 .....l..:..l 31, no ~ <br />Total 2,060 10.1 $374,110 $180 <br /> <br />! Based on canal seepage measurements. <br />! Use 1.2 tons/acre-ft based on comparison w/mass balance analysis <br />in areas with similar groundwater TDS (about 2600 mg/L) . <br />! Based on cost analysis using January 1989 prices, 8-7/8 percent <br />interest, and a project life of 50 years. <br /> <br />. <br /> <br />. <br /> <br />9 <br />