Laserfiche WebLink
<br />G(~279, <br /> <br />#o-r~- <br /> <br />~~(} <br /> <br />"\.,t;:--,:'_.".-~. ~' <br />~C'H'~~""'I~~- " <br />-, ~v-,-' <br /> <br />United States Department of the Interior <br /> <br />BUREAU OF RECLAMATION <br />UPPER COLORADO REGIONAL OFFICE <br />P,O, BOX 1 D68 <br />SALT LAKE ClTI', UTAH 841,17 <br /> <br />tJAN 1 6 1900 <br /> <br />IN REPLY <br />REF'tJC2r21 <br /> <br />j,4[\j -}_ <br /> <br />To: <br /> <br />All Concerned Agencies and Individuals <br /> <br />Subject: <br /> <br />Preliminary Findings Report Concluding the Uinta Basin Unit, Phase <br />II, Colorado River Water Quality Improvement Program (CRWQIP) <br />(Salinity Control Coordination) <br /> <br />Enclosed is the Preliminary Findings Report concluding the Phas,e II Salinity <br />Control Study in the Uinta Basin, Utah. The report ~as prepared pursuant <br />to the Colorado River Basin Salinity Control Act of June 24, 1974 (Public <br />Law 93-320, a8 amended by Public Law 98-569 on October 30, 1984). <br /> <br />\ <br />I <br /> <br />The study evaluated the effectiveness of canal and lateral lining alternatives <br />in the Uinta Basin ~hich were not previQus1y covered in the Phase I study. <br />The study also evaluated the potential for joint irrigation improvements by <br />Reclamation and the Soil Conservation Service. With the exception of 3.2 <br />miles of the Hyton Townsite Canal, the study did not find any cost effective <br />alternatives. <br /> <br /> <br />The My ton Townsite Canal improvements will be added to the recommended plan <br />for the construction of the Uinta Basih Unit. If you have any comments or <br />concerns ~ith the report, please contact Mr. Dave Trueman at (801) 524-6292. <br /> <br />/ <br /> <br />Sincerely, <br /> <br /> <br />Roland Robison <br />Regional nire~tor <br /> <br />Enclosure <br />