Laserfiche WebLink
<br />-1 <br />~J <br />1 <br />I <br />-l <br /> <br />0J15J3 <br /> <br />PROFESSIONAL RECORD <br /> <br />ERWIN B. BARTEL <br /> <br />EDUCATION <br /> <br />Civil Engineering Diploma from the Polytechnic in Gliwice, Poland, 1953. <br /> <br />EXPERIENCE (1950 to date) <br /> <br />I <br />J <br />~ <br />I <br /> <br />Senior Civil Engineer, Engineering Consultants, Inc., Denver, Colorado. Responsible <br />for the structural designs and checking of all civil works construction drawings prepared <br />in the Home Office for various water resources projects, including the Pantabangan Dam, <br />Philippines and Kew Lom Dom, Thailand. <br /> <br />Civil Engineer, Peter K iewitt & Sons Construction Corporation, Omaha, Nebraska. <br />Responsible for preliminary design and estimating of temporary support structure for <br />open cut excavation for several "Metro" projects in Washington, D. C. <br /> <br />Civil Engineer, Engineering Consultants, Inc., Denver, Colorado. Responsible for <br />structural design on Sirikit Dam, reinforced concrete structure. <br /> <br />Structural Designer, Stearns-Roger Corporation, Denver, Colorado. Duites included <br />structural design of heavy industrial buildings and foundations. <br /> <br />..J <br /> <br />Technical Aid, Ministry of Public Works, Building Construction Department, Kabul, <br />Afghanistan. Responsibilities included structural design work, field supervision of <br />foreign and local projects, and consultation services. <br /> <br />'I <br /> <br />I <br />) <br />I <br /> <br />Manager, Consulting and Designing Organization for Coal Mining Industry, Katowice, <br />Poland. Direction of the investment programming in new and remodeled coal mines, <br />with particular emphasis on the design methods and economical aspects. <br /> <br />Structural Designer, Central Consulting and Designing Office for Coal Mining Industry <br />in Poland, Katowice, Poland. Responsible for structural design of complex for "Mate- <br />rial and Ventilating Shaft" - head frame and building, 100 meters long, 4! meter diam- <br />eter shaft and foundation for ventilator. Complex for "fluid sand to the excavated under- <br />ground coal space" - sand reservoir, railroad car unloading bridge, water pumping station, <br />and several others. <br /> <br />.-J <br />I <br /> <br />Assistant Field Engineer, new deep coal mine, 5,000 ton daily output, Katowice, Poland. <br />Responsible for erection of new head frame building including mine shaft head frame struc- <br />ture. <br /> <br />Member: American Concrete Institute. <br /> <br />Registered Professional Engineer: Poland. <br /> <br />~d6 <br />