Laserfiche WebLink
<br />-I <br />I <br /> <br />I <br />"'i <br /> <br />-I <br /> <br />J <br />I <br /> <br />_J <br /> <br />J <br /> <br />-I <br /> <br />4 <br /> <br />0015d6 <br /> <br />PROFESSIONAL RECORD <br /> <br />A. S. ANDREWS <br /> <br />EDUCATION <br /> <br />B.S., Civil Engineering, Colorado State University, 1963 <br />M.S., Water Resources Engineering, Colorado State University, 196~ <br /> <br />SPECIAL TIES <br /> <br />Management of Water Resources Development Projects * Surface and Ground Water <br />Hydrology * Ground Water Modeling * Storm Drainage and Flood Control * Flood <br />plain Information Studies * Hydraulic Analysis * Irrigation and Drainage <br />Systems * Municipal Water Works Engineering * Water Quality Management Plan- <br />ning * Computer Applications to Water Resources Problems <br /> <br />EXPERIENCE <br /> <br />Founder and President, Wnter Resources Con:3ul tants, Inc. (WRC), Denver, Colorado. <br />(1976 to date). Responsible for the supervision, direction and management of all <br />activities of the firm. WRC provides consulting engineering services in various <br />disciplines related to the field of water resources management. Managed over <br />one hundred water resources projects serving clients from both the public and <br />private sector. <br /> <br />2 <br />u <br /> <br />Mana er and Pro .eeL [n ineer, EngineeriruJ Consultants, Inc., Uenver, <br />Colorado, 1973-1976. Duties as Senior Water Resources Engineer, Project <br />Engineer, and Project Manager included responsible direction and coordina- <br />tion of all ECI's work in the United States. Acted as Project Planner and <br />Project Engineer for the design of Blunn Reservoir Dam, a municipal water <br />supply facility for the City of Arvada, Colorado. In the area of urban <br />drainage and flood control; coordinated, directed and managed various studies <br />for the Cities of Northglenn, Crested Butte, Gunnison and Aurora; Counties of <br />Arapahoe, Adams and Gunnison; and the Colorado Water Conservation Board. For <br />Colorado Department of Health, developed ECI's input for a water quulity <br />management plan for the South Platte, River basin in Colorado. Duties also <br />included participation in the direction of hydrologic and project planning <br />studies for several water resources projects under study by ECI in Indonesia, <br />Burma and the Philippines. Assisted in the development of special computer <br />programs for a systems approach to solve urban drainage, flood routing, water <br />supply and water quality problems. <br /> <br /> <br />} <br /> <br />City Enqineer, City of Greenwood Village, Colorado. (1972-1973). Responsibili- <br />ies included supervision, direction and management of municipal engineering work <br />related to various tasks including water supply, sewerage, transportation, parks <br />and recreation, traffic, roads and others. Also, acted in an advisory capacity <br />to the Cby Council and Mayor on engineering matters of concern to the different <br />departments of the city. <br /> <br />27 <br />