My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04145
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC04145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:38:03 AM
Creation date
10/9/2006 4:26:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/23/1996
Author
Ray Bennett
Title
Phase IIIa-White River Basin Enhancements- Memorandum-Subtask 2.05-Define Water Right Classes
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OOO?6'7 <br />i <br /> <br />... <br /> <br />~ <br /> <br />Comments <br /> <br />Following are comments related to the execution of Subtask 2.05, Define Water Right <br />Classes: <br /> <br />. Following is a break down of absolute direct flow decrees in the White River Basin: <br /> <br />Phase II tied to Irrigated land <br />Phase II not tied to Irrigated land <br />Phase III added <br />Subtotal (phase III modeled) <br /> <br />Decrees Percent <br />(cfs) (%)) <br />1,559.60 54 <br />76.85 3 <br />495,61 17 <br />2132.06 73 <br /> <br />Description <br /> <br />Other Rights <br />Total <br /> <br />769.78 <br />2,901.84 <br /> <br />26 <br />100 <br /> <br />. Regarding Exhibit 1 and the above table, a spot check of the 'Other Right' (water <br />rights that occur between Line I, All Absolute water rights and Line 2, Absolute <br />water rights to be modeled in Phase III), indicates they include rights which no longer <br />operate, are associated with non consumptive activities, or are relatively small <br />municipal and industrial rights. The following table identifies two of the larger rights <br />within this group, In addition to those categories described above, the water rights <br />that were not modeled are expected to include ditches which may currently divert but <br />were not tied to irrigated land during the 1993 survey. They might be added if the <br />irrigated acreage data is updated. <br /> <br />Ditch <br /> <br />430809 Meeker Power <br />Ditch <br /> <br />430888 Rainbow Lake <br />Ditch <br /> <br />Decree (crs) <br />161.88 <br /> <br />Comment <br /> <br />No longer operational <br /> <br />31.75 <br /> <br />Non Consumptive <br /> <br />. Although not all water rights are included, the Phase III model does estimate 100% of <br />the consumptive use by irrigation in the basin, This is because all irrigated lands <br />identified in the 1993 survey are included. Sub tasks 2.1 0 and 2.11 describe how <br />100% of the municipal, industrial and storage water use are included in the Phase III <br />model. <br /> <br />fn=lwlstatemlwhitetlwordlmm205,doc <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.