My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04144
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC04144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:38:02 AM
Creation date
10/9/2006 4:26:19 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.400
Description
Colorado River - Colorado River Basin - Colorado River Basin Briefing Documents/History/Corresp.
State
CO
Basin
Western Slope
Date
4/1/1951
Author
Various Authors
Title
Compilation of Resolutions, Comments, and Recommendations received by the CWCB Relating to the Reports on CRSP and Participating Projects and Gunnison River Development Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />tJD{)357 <br /> <br />-17- <br /> <br />AND BE IT FURTHER RESOLVED that the Currecanti Reservoir be included in the <br />initial construction projects and that it be given equal priority with the con- <br />struction of the proposed Echo Park Reservoir project. <br /> <br />AND BE IT FURTHER RESOLVED that a copy of this Resolution ~e sent to the Hon. <br />Clifford Stone, Director of the Colorado Water Conserv~tion 30ard and that a copy <br />be sent to the Board of Directors of the Colorado River iiater Conservation District <br />forthwith. <br /> <br />Attest a true and correct copy <br /> <br />THE LAKE FORK DITCH CmpANY <br /> <br />ORCHARD RANCH DITCH CO. <br /> <br />By Ernest A. Bull <br /> <br />Pres. <br /> <br />By V. Olin Bruton Pres. <br /> <br />TIff', FORREST DITCH COHPANY <br /> <br />FOGG DITCH C~fPANY <br />By W. R. Griffith Pres. <br /> <br />By A. P. Starr <br /> <br />Pres. <br /> <br />THE GRAND MESA WATER US1':RS ASSN. <br />By J. A. Hunnsicker Sec. <br /> <br />{!- ~:!- 'i!- -,~ ";..4 <br /> <br />-::- ~- <br /> <br />" " " " ., " <br />-;.- -,i{' ,,' "';,' -,(' 'H' <br /> <br />;,- " " ',,- -,,- <br /> <br />-" .,,- ,('" <br /> <br />.. " " * <br /> <br />RESOLUTION <br /> <br />WHEREAS The Delta-Montrose Rural Pcwler Lines Association has actively en- <br />~ouraged and fostered the construction of the Currecanti Dam on the Gunnison River <br />for many years, it is h~reby <br /> <br />RESOLVED that the plan of the Bureau of Reclamation for the development of the <br />Colorado River and its tributaries, known as the Upper Colorado Hiver Basin Project, <br />is hereby approved; and it is further <br /> <br />RESOLVED that we favor the substitution of the Currecanti Dam for the .ihite- <br />water Dam, as the dam on the Gunnison River to be constructed in the first phase of <br />the Upper Colorado River Project concur.rently with the Echo Park Dam. <br /> <br />Dated at Delta, Colorado this 13th day of April 1951 at a Special meeting of the <br />Board of Directors. <br /> <br />Attest: <br /> <br />John L~ Burritt <br />President <br /> <br />:alph L. Foster <br />JJi.rector, <br /> <br />G. Blanchard <br />Vice-President <br /> <br />Fran!: Meakor <br />D~rector <br /> <br />Kate E Trac~ <br />. Secretary- reasurer <br /> <br />~lancy NuIter <br />Director <br /> <br />E. H. Franzmeier <br />Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.