Laserfiche WebLink
<br />... <br />( <br />,J' <br />, / <br /> <br />/ <br /> <br />001325 <br /> <br />VI. Transmountain Diversions <br />A. Operations Memo Overview <br />B. Eureka Ditch <br /> <br />VII. Homestake Project <br />A. Operations Memo Overview <br />_ _ _B,_~'lodetSJructure_ _ _ _ _ _ _ <br /> <br />VIII. Shoshone Power <br />A. Operations Memo Overview <br />B. Model Structure <br /> <br />/ <br /> <br />IX. Fryingpan-Arkansas Project <br />A. Operations Memo Overview <br />B. Independence Pass assumptions <br />C. Boustead Tunnel & Busk-Ivanhoe <br />D. Ruedi Reservoir & future operations <br /> <br />X. Silt Project <br />A. Operations Memo Overview <br />B. Grass Valley Canal <br />C. Grass Valley (Harvey Gap) Reservoir <br />D. Irrigation Demands <br />1. Silt Pump <br />2. Multi-structure operation <br /> <br />XI. Municipal Demands <br />A. Operations Memo Overview <br />B. Blue River towns <br />1. Dillon and Clinton Reservoir exchanges <br />2. Keystone Municipal <br />C. Vail Demands <br />1. One node <br />2. Season-specific water rights <br />D. Ute Water District Demands <br />1. Grand Mesa Pipeline <br />2. Ute Water Treatment Plant <br /> <br />'Wlb ~~: +t- CUlJ-~~) IsJ~~ <br />f C \ l",k ~OC2AJf00 (V' <br /> <br />2 <br />