My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04091
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC04091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:37:48 AM
Creation date
10/9/2006 4:23:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
7/1/1982
Title
San Luis Valley Project Closed Basin Division - 1982 - The San Luis Valley Project, Closed Basin Division, Facts and Concepts about the Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. ~1J11li <br /> <br />. <br /> <br />. <br /> <br />F ACT SHE E T <br /> <br />CLOSED BASIN DIVISION, SAN LUIS VALLEY PROJECT <br /> <br />The Clesed Basin Divisien is a well field preject designed to. supplement <br /> <br />water presently available in the Rio. Grande Valley. Cengress autherized <br /> <br />the: Bure-au'ef Reclil!lla,t'wn, to. biJild the project to. assist' .Celerade, 'New <br /> <br />Mexico. and Texas with their water needs. Censtruction ef the preject <br /> <br />will previde water to. help Celerade meet its annual water delivery ebli- <br /> <br />gatiens under the Rio. Grande Cempact and previde additienal water for <br /> <br />use in the Rio. Grande Basin. The preject includes water fer wildlife <br /> <br />purpeses and previde ether wildlife benefits and recreatienal epper- <br /> <br />tunities. <br /> <br />Seme ground water is new being lest by evaperatien. This water will <br /> <br />be pumped frem abeut 170 wells, cenveyed threugh pipelines to. a 42-mile <br /> <br />leng canal, and delivered to. the Rio. Grande River. Many ef these wells <br /> <br />and pipelines and..,parts' ef the ,canal 'will' be 1ecated en what 'is 'new <br /> <br />pr,ivate land. Private land will be purchased fer preject purpesed when' <br /> <br />necessary. Where land to. be used fer the preject is ewued by the State, <br /> <br />the State will previde the necessary land fer the facilities. <br /> <br />The Bureau of Reclamatien intends to. keep ewuers and the public infermed <br /> <br />as the preject deve1epes. Requests fer further infermatien may be <br /> <br />addressed to Bureau ef Rec1amatien , Pest Office Bex 449, Alamesa, Celerade, <br /> <br />81101. <br />
The URL can be used to link to this page
Your browser does not support the video tag.