Laserfiche WebLink
<br />032839 <br /> <br />TABLE OF CONTENTS <br /> <br />PAGE <br /> <br />1. INTRODUCTION <br />II. ANALYSIS OF THE MANAGEMENT SITUATION <br />III. BENCHMARK (SUPPLY) ANALYSIS <br /> <br />5 <br />7 <br /> <br />20 <br /> <br />A. Benchmarks <br /> <br />20 <br /> <br />B. Minimum Management Requirements <br /> <br />20 <br /> <br />C. Individual Benchmark Analysis . <br /> <br />23 <br /> <br />Minimum Level Benchmark 24 <br /> <br />Maximum PNV With NDY, 95% of CMAI <br />and Ending Inventory Constraints Benchmark 26 <br /> <br />Maximum Timber - Without Minimum Management Requirements <br />Benchmark . 30 <br /> <br />Maximum PNV Including Assigned Values Benchmark 34 <br /> <br />Maximum PNV Including Assigned Values <br />- No NDY - Benchmark 38 <br /> <br />Maximum PNV Based On Established Market Values Benchmark 42 <br /> <br />Maximum Winter Range Benchmark 46 <br /> <br />Maximum Range Benchmark 50 <br /> <br />/' <br /> <br />Maximum Water Yield Benchmark <br /> <br />54 <br />58 <br />62 <br />66 <br /> <br />Maximum Timber Level Benchmark <br /> <br />Maximum Timber With NDY for Aspen Benchmark <br /> <br />D. Summary of Benchmark Output Levels <br /> <br />IV. TIMBER RESOURCE LAND SUITABILITY <br /> <br />71 <br />72 <br />75 <br /> <br />V. POTENTIAL TO RESOLVE ICO'S <br /> <br />VI. NEED TO ESTABLISH OR CHANGE MANAGEMENT DIRECTION <br /> <br />2 <br />