Laserfiche WebLink
<br />003401 <br /> <br />CONTENTS <br /> <br />Secti on <br /> <br />Page <br /> <br />SUlIIIII8ry . <br />Contents. <br />Figures . <br />Tables <br />Acknowledgments <br />Chapter 1: Introduction <br />Chapter 2: The value of electric power in Colorado <br />Method one: wholesale markets <br />Method two: unit costs <br />SUllllll8ry . . <br />Chapter 3: Power generated in Colorado <br /> <br />. i <br />ili <br />tv <br /> <br />All sources <br />Small-seale hydro <br />Chapter 4: Valuation of small-seale hydropower <br /> <br />Estimation of power output. <br />Economic value. <br />Summary . . . . <br />Chapter 5: Case studies. <br /> <br />North fork of the San Miguel River. <br />Frying Pan River at Reudi Reservoir <br />Chapter 6: Conclusions <br /> <br />. v <br /> <br />vi <br />1 <br />3 <br />4 <br />8 <br />.11 <br />.13 <br /> <br />.13 <br />.13 <br />.18 <br /> <br />.18 <br />.24 <br />.26 <br />.28 <br /> <br />.28 <br />.30 <br />.40 <br /> <br />.41 <br /> <br />.43 <br /> <br />Appendix A: Glossary. <br />Appendix B: Conversion of electric utility costs to rates. <br /> <br />ili <br />