Laserfiche WebLink
<br />003416 <br /> <br />TABLE 2.1 <br /> <br />Contracts <br /> <br />Contract or Type of Power <br /> <br />Demand <br />($/kw/mo) <br /> <br />Energy <br />(t/kwh) <br /> <br />Average <br />(t/kwh) <br /> <br />PSCo-Co1orado Ute (Demand Only) <br /> <br />11.38 <br /> <br />n.a. <br /> <br />n.a. <br /> <br />PSC-Laramie River (Short Term Energy) <br /> <br />none <br /> <br />1.40 <br /> <br />1.4 <br /> <br />Colorado Springs (Economy) <br /> <br />none <br /> <br />1.50 <br /> <br />1.5 <br /> <br />PSCo-Redlands Water Diatrict <br /> <br />15.50 <br /> <br />1.77 <br /> <br />4.64" <br /> <br />PSCo ("Avoided Cost" Rate) <br /> <br />18.00 <br /> <br />1. 70 <br /> <br />4.99" <br /> <br />.. Assumes 75~ capacity factor on peak. Adjustments proportional. <br />n.a.: not applicable. <br /> <br />TABLE 2.2 <br />Unit Costs <br /> Demand Energy Average <br />Facility ($/kw/mo) (t/kwh) (t/kwh) <br />Pawnee 14.11 ,1. 7 4.50 <br />Nixon 7.23 2.1 3.53 <br />Craig 1 & 2 11. 09 .8 3.00 <br />Craig 3 (1984) 11. 09 1.7 3.90 <br />Rawhide (1984) 19.00 1.7 5.47 <br />Valmont (Natural Gas) Peaking n.a. 12.0 12.0 <br />Pumped Storage n.a. 8.0 8.0 <br /> <br />Note: Costs are estimated for Craig 3 and Rawhide, which will not come <br />on-line until early 1984. <br /> <br />12 <br />