<br />Monthly Report <br />San Luis Valley Projeot <br />Colorado <br />April 1955 <br /> <br />;Mo Grande Dividon <br /> <br />Work on the revised reoort for the Rio Gl'1!\l.do aurl \1eminuche <br />Pass Divisions continued thr<lughout the month. This work required <br />the llerviO$s of all projeot personnel for llIOst of the month. <br /> <br />The Project Manager and the Regional Development Engineer <br />Qonferred with "/IllIter users of thfl Rio Grande Division and with <br />officials of the SUit3 of Colorado on reoolllmendetio.'1B to ~ made <br />in the report, on the Rio Grande and 'Illllllinuohc Pase Divis:10DS of the <br />.Project. <br /> <br />Clqaed Basin Dlvle.lon <br /> <br />Measurements of the f'luotUlltion of the ground water table <br />lfOre made at aoleot.ed "\ills during the month. <br /> <br />Coneioe Division <br /> <br />Arrangements Vlere made to move the Gllte Tender, llarry SiIllCOX, <br />to Platoro on lJay 2, 1955. <br /> <br />~eneral <br /> <br />Windy woather prewiled throughout April and precipiUition <br />wao above normal. <br /> <br />Snow surveys for the li!ay 1 report were completed by <br />April 3D, 1955. <br /> <br />\~~~ <br />\\\\ <br />