My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03798
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC03798
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:36:21 AM
Creation date
10/9/2006 4:11:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
Rio Grande Basin-Rio Grande Basin River Basin Water Projects-San Luis Valley Project
Basin
Rio Grande
Water Division
3
Date
1/1/1955
Title
San Luis Valley Project Monthly Reports-1955
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MONTHLY REPORT <br />SA1~ LUIS VALLEY PROJECT, COLORADO <br />FEBHUARY 1955 <br /> <br />Rio Grande Division <br /> <br />Work on this Division consisted of compiling data, charts <br />etc. for preparation of a report on the feasibility of works proposed <br />for the Division. A copy of all data used in preparing cost curves <br />for Wagon Wheel Gap Dam and Reservoir were furnished the Regional of- <br />fice for review prior to preparation of the final Dhase of the report. <br /> <br />Prenaration of the final report awaits the Evaluation of <br />Flood Control BenefHs by the Corps of Engineers. <br /> <br />Closed Basin Division <br /> <br />Two sets of test wells with accompanying observation wells <br />were nut down at selected points in the area during the month. One <br />well was test-pumped and the data furnished the Geological Survey <br />for using in computing drain yields. . <br /> <br />Fluctuation of the ground water was measured at sixty two <br />selected wells during the month <br /> <br />Conejos Division <br /> <br />The Project Manager called on the President,H. C. Myers and <br />Secretary, Max Miokey to review the status of the Conejoa Water Con- <br />servancy District's finanoial position. It was pointed out that the <br />District was still in arrears on part of its debt to the United <br />states and that prompt payment would lessen the interest penalties. <br /> <br />District officials Vlere reassured of the Bureau's efforts <br />to keep operating oosts at a minimum. <br /> <br />General <br /> <br />Routine administrative work of the project continued during <br />the month. The annual property inventory ires started during the month <br />and routine purchases of necessary articles handled in accordance with <br />approved practice. <br /> <br />Snow surveys were start~d at the end of the month at pre- <br />selected courses. <br /> <br />On February 23rd, the Project Manager conferred with the <br />Regional Director'regarding .nroblems-of administration. It was decided <br />to abolish the job of Administrative Assistant and seek clerical help <br />of Grade GS-2 or CS-3. <br /> <br />The Administrative Assistant was to be offered a similar <br />job on the Carlsbad Project at Ft. Sumner, New Mexico. <br /> <br />\)\)\~t'J<:) <br /> <br />,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.